Skip to main content

Ecuador’s new bridge to be built in sections

Ecuador is working on plans for the new South Crossing Bridge (SCB) spanning the Guayas River, to improve transport connections for the port of Guayaquil. The plans call for the SCB to be constructed in three sections, with the project expected to cost US$1.04 billion. The schedule calls for the link to be completed in 2022, with work starting in the third quarter of 2018. The project is being handled under 40-year concession deal that encompasses the bridge and highway links.
July 31, 2018 Read time: 2 mins

Ecuador is working on plans for the new South Crossing Bridge (SCB) spanning the Guayas River, to improve transport connections for the port of Guayaquil. The plans call for the SCB to be constructed in three sections, with the project expected to cost US$1.04 billion. The schedule calls for the link to be completed in 2022, with work starting in the third quarter of 2018. The project is being handled under 40-year concession deal that encompasses the bridge and highway links. The bridge itself will measure 1.25km-long while the transport upgrades to the port include work to 48km of roads as well as building an additional 2.6km of bridges that includes a crossing of the Cobinas River. The SCB will be constructed at a location where the Guayas River narrows, while also minimising the distance between the port of Guayaquil and the Durán–Boliche highway and the Boliche–Puerto Inca highway. The SCB will be a cable-stayed design with three piers, featuring a y-shaped configuration and twin decks, each carrying two traffic lanes, an emergency lane and provision for pedestrians.

Related Content

  • Ecuador’s road tenders opening
    September 13, 2019
    Ecuador is opening the tender process for nine transport links during the 2019-2020 period.
  • Stantec: coming to an infrastructure site near you
    April 13, 2017
    Acquisitive Canadian firm Stantec is snapping up more transportation expertise as it moves out of its home North American market. David Arminas reports. Last December, politicians from the US states of Kentucky and Indiana celebrated the opening of the second of two major bridges. A ribbon-cutting ceremony took place in cold wintry weather on the new 762m-long cable-stayed Lewis and Clark Bridge. The event marked the finish of the prestigious three-and-half-year Ohio River Bridges Project.
  • New bridge over Nile will help landlocked Uganda
    April 3, 2013
    A new River Nile bridge is essential to boost trade and improve traffic in landlocked Uganda. Shem Oirere reports A new bridge across the River Nile at Jinja, to be constructed by Uganda, is promising to boost trade in eastern Africa and pave the way for smooth and safe traffic in and out of this landlocked country. The bridge, also known as the Second Nile Bridge, is the first cable-stayed bridge in the region and will be constructed at Njeru, 80km east of the Ugandan capital Kampala, along the Kampala-Jin
  • Ecuador to receive proposals for El Oro and Guayas motorway
    July 29, 2015
    Ecuador's Transport and Public Works Ministry will receive proposals for a 95km motorway between El Oro and Guayas provinces this month. Seven firms are reportedly interested in building the motorway under a 30-year concession and work could start by the end of the year, according to a report in the Telegrafo newspaper. The motorway will have three toll booths that each will charge US$1.50. (EUR 1.37) each. The winner will operate the concession for 30 years. The road will have a length of 95kms. The c