Skip to main content

Ecuador’s new bridge to be built in sections

Ecuador is working on plans for the new South Crossing Bridge (SCB) spanning the Guayas River, to improve transport connections for the port of Guayaquil. The plans call for the SCB to be constructed in three sections, with the project expected to cost US$1.04 billion. The schedule calls for the link to be completed in 2022, with work starting in the third quarter of 2018. The project is being handled under 40-year concession deal that encompasses the bridge and highway links.
July 31, 2018 Read time: 2 mins

Ecuador is working on plans for the new South Crossing Bridge (SCB) spanning the Guayas River, to improve transport connections for the port of Guayaquil. The plans call for the SCB to be constructed in three sections, with the project expected to cost US$1.04 billion. The schedule calls for the link to be completed in 2022, with work starting in the third quarter of 2018. The project is being handled under 40-year concession deal that encompasses the bridge and highway links. The bridge itself will measure 1.25km-long while the transport upgrades to the port include work to 48km of roads as well as building an additional 2.6km of bridges that includes a crossing of the Cobinas River. The SCB will be constructed at a location where the Guayas River narrows, while also minimising the distance between the port of Guayaquil and the Durán–Boliche highway and the Boliche–Puerto Inca highway. The SCB will be a cable-stayed design with three piers, featuring a y-shaped configuration and twin decks, each carrying two traffic lanes, an emergency lane and provision for pedestrians.

Related Content

  • First concrete beam raised for new Mersey bridge link
    December 11, 2015
    The first concrete bridge beam for a junction on the new Mersey Gateway route has been lifted into place. Work is underway on a major road junction for the Mersey Gateway Project, with the first of 156 of the concrete beams has been lifted into place as work ramps up at a major road junction. A 550tonne capacity crane lowered the 106tonne beam into position at the Bridgewater junction in Runcorn, where the new Astmoor Bridgewater viaduct is being built over the Bridgewater canal. Two elevated slip roads ar
  • $250 million for Oregon-Washington bridge replacement
    July 10, 2025
    Oregon and Washington will provide $250 million for the Hood River-White Salmon Bridge replacement.
  • Kenya rehabilitates, widens, tolls Northern Corridor
    November 8, 2017
    A massive highway project in Kenya will boost transport for the country as well as its neighbours - Shem Oirere reports. Kenya has commenced the process of rehabilitating, expanding and tolling of 657km of East Africa’s Northern Corridor that is anchored on the Indian Ocean port of Mombasa and which links the gateway with landlocked countries of Uganda, Rwanda, Burundi and parts of eastern Democratic Republic of Congo (DRC).
  • New bridges and roads in Vietnam
    April 30, 2025
    New bridges and roads in key Vietnamese cities worth up to $2.43 billion will boost transport.