Skip to main content

Ecuador road widening project planned

A road widening project worth US$134.3 million is now going ahead in Ecuador. The road connecting Aloag with Santo Domingo is being improved along a 100km stretch, widening the route so that it will feature two lanes in either direction instead of the single lane in either direction at present. This will boost the transport connection between Pichincha Province and Santo Domingo de los Tsachilas Province. The contract was originally awarded in 2015 but stalled in 2017 following a disagreement over tolling.
July 3, 2018 Read time: 2 mins

A road widening project worth US$134.3 million is now going ahead in Ecuador. The road connecting Aloag with Santo Domingo is being improved along a 100km stretch, widening the route so that it will feature two lanes in either direction instead of the single lane in either direction at present. This will boost the transport connection between Pichincha Province and Santo Domingo de los Tsachilas Province. The contract was originally awarded in 2015 but stalled in 2017 following a disagreement over tolling. Funding has now been secured by the local authorities and the work should be complete in early 2019.

Also being planned by Ecuador’s Ministry of Transport and Public Works (MOTP) are a bypass around Santo Domingo as well as improvement works to the road connecting Santo Domingo with Quevedo and the road linking Babahoyo with Jujan. Studies into road projects connecting through to Alluriquin and Tinalandia are being handled by MOTP, with the schedule calling for the construction to be complete by 2021. New road tenders are opening in Santo Domingo de los Tsachilas Province, with the contracts due to be awarded in late

Related Content

  • Kosovo's award-winning green highway construction
    March 20, 2012
    A new highway is proving an economic lifeline for the tiny country of Kosovo – Mike Woof reports. Road projects in Europe rarely meet such widespread public approval and support as the new Route 7 highway being built in the new Balkan state of Kosovo. The first sections of the new road opened to traffic in November 2011, with locals turning out in large numbers to celebrate the event. The official opening was carried out by the country’s prime minister Hashim Thaçi, president Atifete Jahjaga, and members of
  • Bolivian project moving forward
    February 24, 2012
    Bolivia's 306km Villa Tunari-San Ignacio de Moxos road is due for completion in 2014. The new road will provide and important link for the departments of Beni and Cochabamba
  • Colombia’s ANI agency is driving forward the 4G PPP programme
    April 4, 2016
    Andrade Moreno is a man on a mission. The head of Colombia's infrastructure agency ANI explains how the organisation is giving foreign companies increasing confidence to invest time and money in the country. David Arminas reports Change, especially when it touches the highest levels of South American business and politics, can bring with it personal danger. Luis Fernando Andrade Moreno, president of Colombia's National Infrastructure Agency - ANI - was aware of this when he took on the role in 2011. B
  • California connection construction contract
    December 1, 2017
    The contract to widen a key section of one of Northern California’s most congested highways has now been awarded. The US$107 million package of works will see the building of a new carpool and express lane along a 14.5km stretch of Interstate 680 in the Bay Area. The lane will be built along the northbound stretch of the highway between the Auto Mall Parkway and Highway 84. The southbound express lane will also be upgraded. Construction on this section is being funded by local sales taxes and the work is