Skip to main content

EC approves €246 million for Targu Mures-Campia Turzii motorway

The European Commission has approved €246 million towards construction of Romania’s Targu Mures-Campia Turzii section of the A 3motorway. The EC money for the 51km four-lane section is from the EC’s Cohesion Fund, according to a report by the Romania Journal. Bechtel was originally going to build most of the 603km A3 to connect Bucharest with the Transylvania region and the north-west part of the country. Work should have started by now but contractual issues with Bechtel hampered progress.
June 22, 2018 Read time: 1 min

The European Commission has approved €246 million towards construction of Romania’s Targu Mures-Campia Turzii section of the A 3motorway.

The EC money for the 51km four-lane section is from the EC’s Cohesion Fund, according to a report by the Romania Journal.

4138 Bechtel was originally going to build most of the 603km A3 to connect Bucharest with the Transylvania region and the north-west part of the country. Work should have started by now but contractual issues with Bechtel hampered progress.

For more information on companies in this article

Related Content

  • Bratislava bypass and Karpaty tunnel completion set for 2030
    June 18, 2018
    Slovakia’s national motorway company NDS expects that the Bratislava bypass on the D4 motorway together with the Karpaty tunnel will be completed around 2030. The D4 motorway is part of the trans-European transport network and will connect with the planned R7 expressway linking western and eastern Slovakia, and the existing D1 and D2 motorways”. Apart from construction works on part of the D4 motorway, another two stretches are planned on this link, including the 3.6km stretch from Devinska Nova Ves t
  • Poland: tendering for Lodz's Western Ring-Road attracts 17 offers
    February 10, 2017
    The tender for Lodz's €372 million Western Ring-Road (Zachodnia Obwodnica Lodzi) has attracted 17 bidders, according to Polish media. Construction has been split into two parts: a 12.2km section between the Lodz-Lublinek junction and the Lodz Teofilow junction and a section of 16.3km section from Lodz Teofilow to Slowik, excluding the Emilia junction. Budimex has reportedly made the lowest offer in both contract contests. Polish media also reported that €530 million from the European Union’s Cohesi
  • Make the case for electronic tolling, ASECAP conference delegates heard
    September 14, 2015
    Mobility pricing and electronic tolling is the future, delegates to a recent ASECAP Study Days conference, reports Geoff Hadwick at the Lisbon event. The international road tolling industry is failing to make its case and the sector is losing out to other social and political lobby groups. As a result, “tolling is still on the sidelines”, according to the head of the Washington-based International Bridge, Tunnel and Turnpike Association. IBTTA chief executive Pat Jones issued his stark warning at the
  • Opening date for Romania's Brăila Bridge
    December 15, 2021
    The suspension bridge over the Danube River should be open by the end of next year.