Skip to main content

EC approves Croatia’s Istarski Ipsilon – Istsrian Y - expansion

The European Commission has approved €165 million for expansion and upgrading of Croatia’s Istrian Y - Istarski Ipsilon - road network. The Istrian Y on the northern Istrian peninsula near Italy consists of a section of the A8 betweenb Matulji-Kanfanar and a section of the A9, from the Slovenian border-Kanfanar-Pula. The name is derived from the geographic layout of the highway network that takes the shape of the letter ‘Y’. The three stretches meet at the Kanfanar Interchange in south central Istria.
June 22, 2018 Read time: 2 mins

The European Commission has approved €165 million for expansion and upgrading of Croatia’s Istrian Y - Istarski Ipsilon - road network.

The Istrian Y on the northern Istrian peninsula near Italy consists of a section of the A8 betweenb Matulji-Kanfanar and a section of the A9, from the Slovenian border-Kanfanar-Pula.

The name is derived from the geographic layout of the highway network that takes the shape of the letter ‘Y’. The three stretches meet at the Kanfanar Interchange in south central Istria.

The complex was built and is maintained by the Croatian company BINA Istra, founded in 1995. The concession agreement was for 32 years, until 2027.

Ownership of the Bina Istria is BINA Fincom (67%), Bouygues (16%), Hrvatske autoceste (14.8%) and Istarska autocesta (2.2%).

The north-east section of the ‘Y’ is a 64km stretch of the A8 from Matulji and finishes at the Kanfanar interchangem where it meets the A9. Along this A8 section is the 3.4km Učka Tunnel, the third longest in Croatia and opened in 1981.

The northwest branch of the Istrian Y is a 77km A9 section connecting the Croatian-Slovenian border near Sečovlje. Along this section is Croatia’s highest bridge, the 520m-long girder Limska Viaduct, opened in 1991 and rising 120m above ground.

Related Content

  • Taking the coast road on Reunion Island
    April 4, 2017
    An ambitious project on Reunion Island will improve transport
  • Six new highways for India’s Gujarat State
    October 6, 2014
    In India work is in hand for six new highways in Gujarat State. Approval for the projects has been given by the Indian Government. The new links will be two lane National Highways. The longest of the six links will be the 181km connection between Mahuva and Jetpur, with the next longest being the 165km Radhanpur-Charada stretch and followed by the 163km section between Bhimasar and Khavda. There will also be a 106km stretch between Ahwa and Pipaliya close to Maharashtra border, the Dhoraji-Jamnagar measurin
  • Reunion Island coastal road delays continue
    January 21, 2021
    Delays continue to trouble the Reunion Island coastal road project.
  • Work underway for new road tunnel in Northern Poland
    October 25, 2019
    Preparation work is now starting on a new tunnel project to connect Uznam Island with Wolin Island in Northern Poland. Clearance work is underway at present with the actual construction activity due to start in January 2020. Costing €184 million, the work involves building a 3.4km unnel, which is due for completion by September 2022. The area is a key holiday destination for tourists and is close to the border with Germany. The new tunnel will improve transport connections and cut delays during holiday peri