Skip to main content

EC approves Croatia’s Istarski Ipsilon – Istsrian Y - expansion

The European Commission has approved €165 million for expansion and upgrading of Croatia’s Istrian Y - Istarski Ipsilon - road network. The Istrian Y on the northern Istrian peninsula near Italy consists of a section of the A8 betweenb Matulji-Kanfanar and a section of the A9, from the Slovenian border-Kanfanar-Pula. The name is derived from the geographic layout of the highway network that takes the shape of the letter ‘Y’. The three stretches meet at the Kanfanar Interchange in south central Istria.
June 22, 2018 Read time: 2 mins

The European Commission has approved €165 million for expansion and upgrading of Croatia’s Istrian Y - Istarski Ipsilon - road network.

The Istrian Y on the northern Istrian peninsula near Italy consists of a section of the A8 betweenb Matulji-Kanfanar and a section of the A9, from the Slovenian border-Kanfanar-Pula.

The name is derived from the geographic layout of the highway network that takes the shape of the letter ‘Y’. The three stretches meet at the Kanfanar Interchange in south central Istria.

The complex was built and is maintained by the Croatian company BINA Istra, founded in 1995. The concession agreement was for 32 years, until 2027.

Ownership of the Bina Istria is BINA Fincom (67%), Bouygues (16%), Hrvatske autoceste (14.8%) and Istarska autocesta (2.2%).

The north-east section of the ‘Y’ is a 64km stretch of the A8 from Matulji and finishes at the Kanfanar interchangem where it meets the A9. Along this A8 section is the 3.4km Učka Tunnel, the third longest in Croatia and opened in 1981.

The northwest branch of the Istrian Y is a 77km A9 section connecting the Croatian-Slovenian border near Sečovlje. Along this section is Croatia’s highest bridge, the 520m-long girder Limska Viaduct, opened in 1991 and rising 120m above ground.

Related Content

  • Crane fleet helping construct Indian highway
    January 5, 2015
    Manitowoc’s Grove cranes are helping transform a major highway in north west India, writes Mike Woof In India a fleet of rough terrain cranes has played a key role in constructing a major highway project.
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s
  • Zambia road surfacing upgrade
    February 8, 2018
    Work is starting on an upgrade for a 100km stretch of road in Zambia. The route connects Nchelenge and Chiengi districts and will benefit from a new asphalt surface. The project is costing US$77 million and is being carried out by the contractor Sinohydro Zambia. Delays to the work have been caused by heavy rains however. The Zambian Government has paid an initial $3.8 million for the work to be carried out and the project is expected to take two years to complete.
  • Key expressway route through Hunter Valley
    November 11, 2013
    Australia’s Hunter Valley will benefit from a new high speed expressway, which is currently under construction - Simon Gould reports Located two hours north of Sydney, the Hunter Valley region in New South Wales is one of Australia’s largest producers of coal and wine. With international demand, particularly from Asia, for both continuing to increase, a significant upgrade of infrastructure was required between the region and the port of Newcastle, the world’s largest coal export port. However the strict en