Skip to main content

EC approves Croatia’s Istarski Ipsilon – Istsrian Y - expansion

The European Commission has approved €165 million for expansion and upgrading of Croatia’s Istrian Y - Istarski Ipsilon - road network. The Istrian Y on the northern Istrian peninsula near Italy consists of a section of the A8 betweenb Matulji-Kanfanar and a section of the A9, from the Slovenian border-Kanfanar-Pula. The name is derived from the geographic layout of the highway network that takes the shape of the letter ‘Y’. The three stretches meet at the Kanfanar Interchange in south central Istria.
June 22, 2018 Read time: 2 mins

The European Commission has approved €165 million for expansion and upgrading of Croatia’s Istrian Y - Istarski Ipsilon - road network.

The Istrian Y on the northern Istrian peninsula near Italy consists of a section of the A8 betweenb Matulji-Kanfanar and a section of the A9, from the Slovenian border-Kanfanar-Pula.

The name is derived from the geographic layout of the highway network that takes the shape of the letter ‘Y’. The three stretches meet at the Kanfanar Interchange in south central Istria.

The complex was built and is maintained by the Croatian company BINA Istra, founded in 1995. The concession agreement was for 32 years, until 2027.

Ownership of the Bina Istria is BINA Fincom (67%), Bouygues (16%), Hrvatske autoceste (14.8%) and Istarska autocesta (2.2%).

The north-east section of the ‘Y’ is a 64km stretch of the A8 from Matulji and finishes at the Kanfanar interchangem where it meets the A9. Along this A8 section is the 3.4km Učka Tunnel, the third longest in Croatia and opened in 1981.

The northwest branch of the Istrian Y is a 77km A9 section connecting the Croatian-Slovenian border near Sečovlje. Along this section is Croatia’s highest bridge, the 520m-long girder Limska Viaduct, opened in 1991 and rising 120m above ground.

Related Content

  • Serbia speeding spending on roads
    May 21, 2014
    Serbia is planning to speed construction of its highway network. A key project being prioritised is the Corridor 10 motorway, which is due for completion by September 2016. Another priority project is for Corridor 11 and for several regional road routes. At present the Corridor 10 sections between Sid and Belgrade, and Subotica and Belgrade have been built, while work on the 22km Ipsilon stretch between Subotica and Kelebija is underway. Work is also underway on the 96km south node from Grabovnica to Presev
  • Cengiz wins Corridor VC contract in Bosnia
    March 21, 2023
    Cengiz submitted the lowest bid in the tender which attracted three offers in the deal said to be worth around €361.8 million, according to Bosnia’s state highways agency Autoceste.
  • Bosnia cancels a tender for Corridor 5C, part of European route E73
    March 13, 2017
    Bosnia is cancelling a tender for part of its Corridor 5C project, an integral part of the class-A north-south central European route E73. Route E73 runs around 700km from Hungary south through eastern Croatia to Bosnia and Herzegovina and the Adriatic Sea in the area of Ploče port. The longest part of this corridor goes through Bosnia and Herzegovina – nearly 340km. Director of the Bosnian motorways company Autoput FBiH, Adnan Terzic, confirmed the cancelled tender to the Bosnian daily newspaper Dnev
  • Fourth lane for Rome section of Italy’s A1
    June 28, 2023
    Under the agreement, around 16 hectares of trees will be planted, 3.4km of noise barriers installed and a network of cycle paths will be planned.