Skip to main content

Duna Aszfalt wins M44 dualing between Bekescsaba and Kondoros

Hungarian contractor Duna Aszfalt has won the tender for building a section of the M44 dual carriageway between Bekescsaba and Kondoros. The €133 million deal is for 18km of the M44. The other bidders were Strabag Altalanos Epito, Colas Hungaria with Colas Kozlekedesepito and a consortium including Pannon-Doprastav, Subterra-Raab and Domper. Békéscsaba is near the Romanian border with the M5 interchange at Kecskemét. Meanwhile, under the Rural Development Programme, the government said it will boost
January 10, 2018 Read time: 1 min

Hungarian contractor Duna Aszfalt has won the tender for building a section of the M44 dual carriageway between Bekescsaba and Kondoros.

The €133 million deal is for 18km of the M44.

The other bidders were Strabag Altalanos Epito, Colas Hungaria with Colas Kozlekedesepito and a consortium including Pannon-Doprastav, Subterra-Raab and Domper.

Békéscsaba is near the Romanian border with the M5 iterchange at Kecskemét.

Meanwhile, under the Rural Development Programme, the government said it will boost finances for upgrading roads around smaller towns to more than €90 million.

Related Content

  • Widening for key section of UK’s A11 route complete
    December 12, 2014
    Contractor Balfour Beatty has completed the €132.4 million (£105 million) upgrade of the last remaining single carriageway section of the A11. This section of the route runs between Barton Mills in Suffolk and Thetford in Norfolk. The work involved dualling nearly 15km of carriageway on behalf of the Highways Agency.
  • Bolivian road development programme
    August 9, 2022
    Bolivia’s road development programme is moving ahead.
  • Cables up for Romania’s Brăila Bridge
    June 16, 2021
    The Astaldi and IHI Infrastructure Systems joint venture reports that work will soon start on the road deck for Romania’s Brăila Bridge.
  • Canada’s toll Highway 407 extension east of Toronto opens
    June 21, 2016
    A US$780 million eastward extension to Toronto’s major toll highway 407 has opened after four years of construction. Work on 407 East Phase 1 project – which also included construction of the smaller Highway 412 – involved building more than 148 lane-kilometres and 11 interchanges. The 22km road stretches from Brock Road in the town of Pickering to Harmony Road in the city of Oshawa. Highway 412 is a 10km north-south road that connects Highway 407 to Highway 401. Travel on the toll road will be free u