Skip to main content

Duna Aszfalt wins M44 dualing between Bekescsaba and Kondoros

Hungarian contractor Duna Aszfalt has won the tender for building a section of the M44 dual carriageway between Bekescsaba and Kondoros. The €133 million deal is for 18km of the M44. The other bidders were Strabag Altalanos Epito, Colas Hungaria with Colas Kozlekedesepito and a consortium including Pannon-Doprastav, Subterra-Raab and Domper. Békéscsaba is near the Romanian border with the M5 interchange at Kecskemét. Meanwhile, under the Rural Development Programme, the government said it will boost
January 10, 2018 Read time: 1 min

Hungarian contractor Duna Aszfalt has won the tender for building a section of the M44 dual carriageway between Bekescsaba and Kondoros.

The €133 million deal is for 18km of the M44.

The other bidders were Strabag Altalanos Epito, Colas Hungaria with Colas Kozlekedesepito and a consortium including Pannon-Doprastav, Subterra-Raab and Domper.

Békéscsaba is near the Romanian border with the M5 iterchange at Kecskemét.

Meanwhile, under the Rural Development Programme, the government said it will boost finances for upgrading roads around smaller towns to more than €90 million.

Related Content

  • Metrostav/Strabag win Edvard Benes deal
    November 23, 2023
    The €22 million renovation on the bridge over the Elbe in the Czech Republic will start in 2025.
  • New Argentina dual carriageway project
    September 15, 2017
    Tendering is being opened out for a new dual carriageway connection in Argentina, located just to the south of Mendoza. The 25km link will provide an improved link between Route 7 and Route 40, joining the towns of Palmira and Agrelo. The project is expected to cost close to US$151 million, with financing being provided by the Inter-American Development Bank (IADB). The new dual carriageway will reduce journey times between Palmira and Agrelo.
  • Strabag wins €83.3mn Bosnia motorway contract
    September 17, 2013
    Strabag has won an €83.3 million contract to build a 10.4km section of the Corridor 5c motorway in Bosnia. The major contract for the Svilaj-Odžak section of the international motorway corridor includes the construction of highway, the border crossing at Svilaj, the Svilaj toll station, two service areas and two motorway exits.
  • Bolivia dual carriageway project stalled
    September 12, 2016
    Work remains at a halt on the 70km dual carriageway upgrade connecting Yapacani with Montero in Bolivia’s Santa Cruz department. A disagreement between the Mexican construction company that was building the link, Tradeco, and Bolivia’s road administration department, ABC, resulted in the contract being cancelled. The route, Highway 4, runs from Yapacani through Santa Fe, San Carlo and Portachuelo to Montero and the project was intended to improve the road and boost its capacity by increasing the number of l