Skip to main content

Duna Aszfalt wins M44 dualing between Bekescsaba and Kondoros

Hungarian contractor Duna Aszfalt has won the tender for building a section of the M44 dual carriageway between Bekescsaba and Kondoros. The €133 million deal is for 18km of the M44. The other bidders were Strabag Altalanos Epito, Colas Hungaria with Colas Kozlekedesepito and a consortium including Pannon-Doprastav, Subterra-Raab and Domper. Békéscsaba is near the Romanian border with the M5 interchange at Kecskemét. Meanwhile, under the Rural Development Programme, the government said it will boost
January 10, 2018 Read time: 1 min

Hungarian contractor Duna Aszfalt has won the tender for building a section of the M44 dual carriageway between Bekescsaba and Kondoros.

The €133 million deal is for 18km of the M44.

The other bidders were Strabag Altalanos Epito, Colas Hungaria with Colas Kozlekedesepito and a consortium including Pannon-Doprastav, Subterra-Raab and Domper.

Békéscsaba is near the Romanian border with the M5 iterchange at Kecskemét.

Meanwhile, under the Rural Development Programme, the government said it will boost finances for upgrading roads around smaller towns to more than €90 million.

Related Content

  • Morocco’s massive motorway building programme
    July 24, 2025
    Morocco’s massive motorway building programme will develop the economy.
  • Latin America invests in infrastructure growth
    February 15, 2012
    Travelling in one of the world's most diverse regions is not always easy, but spectacular engineering feats will make life easier as Patrick Smith reports. Five years ago a report from the World Bank noted that infrastructure in most of Latin America and the Caribbean (LAC) had improved over the previous ten years.
  • Romania road tender winner selected
    November 14, 2022
    The winner has been selected in Romania for a key road tender.
  • Nigeria’s FEC approve road works valued at US$768.43 million
    August 22, 2013
    Nigeria’s Federal Executive Council (FEC) has approved reconstruction deals for the five main economic arterial roads worth US$768.43 million (NGN 123.8 billion). A $92.1 million (NGN 14.99 billion) deal will see Julius Berger carry out the Apapa-Oshodi expressway section 2, phase II reconstruction has also been approved. The project is targeted for completion in 15 months. Kopek Construction has secured a $45.1 million (NGN 7.34 billion) deal to complete the Akure to Ilesha road in 21. Triacta Nigeria