Skip to main content

Duna Aszfalt wins M44 dualing between Bekescsaba and Kondoros

Hungarian contractor Duna Aszfalt has won the tender for building a section of the M44 dual carriageway between Bekescsaba and Kondoros. The €133 million deal is for 18km of the M44. The other bidders were Strabag Altalanos Epito, Colas Hungaria with Colas Kozlekedesepito and a consortium including Pannon-Doprastav, Subterra-Raab and Domper. Békéscsaba is near the Romanian border with the M5 interchange at Kecskemét. Meanwhile, under the Rural Development Programme, the government said it will boost
January 10, 2018 Read time: 1 min

Hungarian contractor Duna Aszfalt has won the tender for building a section of the M44 dual carriageway between Bekescsaba and Kondoros.

The €133 million deal is for 18km of the M44.

The other bidders were Strabag Altalanos Epito, Colas Hungaria with Colas Kozlekedesepito and a consortium including Pannon-Doprastav, Subterra-Raab and Domper.

Békéscsaba is near the Romanian border with the M5 iterchange at Kecskemét.

Meanwhile, under the Rural Development Programme, the government said it will boost finances for upgrading roads around smaller towns to more than €90 million.

Related Content

  • Romanian bridge project well underway
    June 8, 2022
    Romania’s Braila Bridge project is well underway.
  • IRD wins Georgia state weigh-in-motion deal
    March 9, 2015
    International Road Dynamics (IRD) will design, supply and install 19 mainline weigh-in-motion systems throughout the US State of Georgia. IRD, based in the city of Saskatoon in the Canadian province of Saskatchewan, said the contract is worth US$7.93 million. The deal includes mainline WIM scales on the interstate, at the roadside and in scale houses as well as license plate reading, USDOT number reading, side view cameras and over-height detection systems at 19 weigh station locations. IRD’s systems will c
  • STRABAG will lead A4 highway deal in Poland
    May 9, 2013
    Austrian contractor STRABAG is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the
  • Riyadh’s transport infrastructure upgrade programme
    August 29, 2013
    IRF chairman and mayor of Riyadh, Eng Abdullah A Almogbel, discusses the city’s massive infrastructure investment and the pressing need for this development work Saudi Arabian capital Riyadh is fast growing with a pressing need for additional transport infrastructure resulting in a massive investment programme. The oil industry has fuelled Riyadh’s rapid expansion from being a medium sized town just 100 years ago, to its status as a major city today. With the explosion in vehicle use during the 20th ce