Skip to main content

Duna Aszfalt wins M44 dualing between Bekescsaba and Kondoros

Hungarian contractor Duna Aszfalt has won the tender for building a section of the M44 dual carriageway between Bekescsaba and Kondoros. The €133 million deal is for 18km of the M44. The other bidders were Strabag Altalanos Epito, Colas Hungaria with Colas Kozlekedesepito and a consortium including Pannon-Doprastav, Subterra-Raab and Domper. Békéscsaba is near the Romanian border with the M5 interchange at Kecskemét. Meanwhile, under the Rural Development Programme, the government said it will boost
January 10, 2018 Read time: 1 min

Hungarian contractor Duna Aszfalt has won the tender for building a section of the M44 dual carriageway between Bekescsaba and Kondoros.

The €133 million deal is for 18km of the M44.

The other bidders were Strabag Altalanos Epito, Colas Hungaria with Colas Kozlekedesepito and a consortium including Pannon-Doprastav, Subterra-Raab and Domper.

Békéscsaba is near the Romanian border with the M5 iterchange at Kecskemét.

Meanwhile, under the Rural Development Programme, the government said it will boost finances for upgrading roads around smaller towns to more than €90 million.

Related Content

  • Cost of D1 section Hubova-Ivachnova rises 40%
    August 3, 2023
    In Slovakia, the 15km Ružomberok bypass, including the 3.6km Čebrať Tunnel, is now €93 million more expensive than nine years ago.
  • Modern road system is 'a must'
    August 2, 2012
    Australia's GDP could see a major increase if traffic bottlenecks in big cities were to be removed, and the government is addressing this as a matter of urgency A modern road system is a must in Australia where it is estimated that the removal of traffic bottlenecks could potentially raise the country's GDP by 0.8%. According to the Committee for Economic Development of Australia (CEDA), which made the prediction, infrastructure bottlenecks (particularly in cities, which account for over 70% of the country'
  • Bosnia cancels a tender for Corridor 5C, part of European route E73
    March 13, 2017
    Bosnia is cancelling a tender for part of its Corridor 5C project, an integral part of the class-A north-south central European route E73. Route E73 runs around 700km from Hungary south through eastern Croatia to Bosnia and Herzegovina and the Adriatic Sea in the area of Ploče port. The longest part of this corridor goes through Bosnia and Herzegovina – nearly 340km. Director of the Bosnian motorways company Autoput FBiH, Adnan Terzic, confirmed the cancelled tender to the Bosnian daily newspaper Dnev
  • Romania: more A3 soon to open
    October 28, 2020
    Around 160km of the A3 are now open.