Skip to main content

Doboj headed for a 5C bypass

The 53km bypass is part of upgrading for the European route Corridor 5C.
By David Arminas November 2, 2020 Read time: 2 mins
Doboj in Bosnia’s Republika Srpska is on Europe's Corridor 5C route (photo © Ahmet Hukic/Dreamstime)

Bosnia’s government and that of the country’s autonomous region Republika Srpska are discussing construction of the Putnikovo Brdo Dva tunnel, part of the Doboj Bypass.

The 53km long bypass is part of the larger 14km upgrading project of the European route Corridor 5C. The route will be an upgrade to motorway standard mostly of existing routes, according to the European Bank for Reconstruction and Development. The EBRD is investing around €210 million in the overall work.

Bosnian media said that the directors of the two motorway companies Autoputevi Republika Srpska and the federated Bosnian agency Autoceste Federacije BiH are looking to jointly construct the 700m-long Putnikovo Brdo Dva (Dva meaning 2) tunnel and other planned road projects along Corridor 5C within the autonomous region. Republika Srpska was officially created as part of the Dayton Peace Accord that ended the Bosnian war in the mid-1990s.

The upgrading is a follow on operation to the EBRD’s previous projects for the construction of key motorway sections of  Corridor 5C in Bosnia Hercegovina. The Corridor connects the Port of Ploce in Croatia with the Hungarian capital Budapest and is part of the Trans-European Transport Network (TEN-T) and South-East European Transport Observatory (SEETO).

Meanwhile, Bosnia’s national roads agency JP Ceste FBiH reports that construction of the Neum-Stolac road is on schedule, with completion is expected by February 2022. The 1km Zaba tunnel and the 2.7km Prapratnica-Hutovo segment are due to be completed this fall.

Related Content

  • A key section of highway is now open in Romania
    July 26, 2012
    In Romania the northern section of the bypass around the city of Constanta is open to traffic. The bypass forms part of the Pan-European Road Corridor IV and work on this section was financed by the European Bank for reconstruction and Development (EBRD). The southern stretch of the 23km bypass was completed in 2011. Now it is complete, the bypass will carry heavy port traffic away from Constanta. It will also provide a free-flowing route for tourist traffic from Romanian capital Bucharest and the north of
  • Bosnia tunnel tender opening for bidding
    July 18, 2019
    The tender process is opening in Bosnia for a key tunnel project. The new Racin to Ivan Tunnel section will form part of the important Corridor 5C route. Financing for the project is being provided by the European Investment Bank (EIB). The work is expected to cost €50 million and the project will be managed by Bosnia’s state-owned road business, Autoceste FbiH.
  • Corridor for prosperity: The 5G Road
    June 14, 2019
    The next generation of highways will be a matrix of smart, intelligent and dynamic technologies that lower maintenance costs and ensure user safety. But challenges lie ahead, as Geoff Hadwick discovered in Dubrovnik The fifth-generation road is about to provide the world’s highway authorities with a big leap forward. This “forever-open”, self-healing road will integrate innovation into infrastructure, vehicles and entire intelligent transport systems, says Adewole Adesiyun, deputy secretary general of
  • Croatia-Bosnia connection
    October 2, 2018
    The Svilaj Bridge connecting Croatia and the Federation of Bosnia and Herzegovina is nearly 40% complete, according to the contractors and the Croatian Motorways Directorate. Locally, the Svilaj Bridge – financially a 50-50 project between the two countries - is part of a motorway running from Beli Manastir to Osijek and on tyo Svilaj. But the route is also part of the motorway Budapest-Osijek-Sarajevo-Plocˇ which is the Pan European Corridor Vc (Corridor 5, branch c) connecting Budapest with the Adriatic.