Skip to main content

Danish-German Fehmarn Belt road and rail tunnel hits funding snag

A Danish newspaper has learned of a significant European Union funding gap for one of Europe’s most ambitious transportation road and rail projects. The Fehmarn Belt Fixed Link would connect the German island of Fehmarn with the Danish island of Lolland. A submersed tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea. Last February news emerged that contractors had revamped their cost estimates, adding nearly €1.2 billion to the project. This put the final cost of the 18
July 9, 2015 Read time: 3 mins
A Danish newspaper has learned of a significant 1116 European Union funding gap for one of Europe’s most ambitious transportation road and rail projects.

The Fehmarn Belt Fixed Link would connect the German island of Fehmarn with the Danish island of Lolland. A submersed tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea.

Last February news emerged that contractors had revamped their cost estimates, adding nearly €1.2 billion to the project. This put the final cost of the 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel, at just under €7.4 billion.

Business daily Dagbladet Borsen has now reported that the EU has given the project €590 million, far less than the €1 billion or so the Danes had expected and leaves a budget hole of more than €402 million.

However, Denmark’s former transport minister, Magnus Heunicke, said he hoped more money would be coming from the EU later on for the project that is expected to be open by 2024.

Borsen also reported that Denmark has another opportunity to apply for EU funds during the next application round in 2018, although no level of funding is guaranteed beforehand.

The new transport minister Hans Christian Schmidt will be under pressure to prepare for the new round, Borsen reported.

In April, the Danish parliament approved the Construction Act for the Danish section of the link which authorises construction of the tunnel. The act also authorises state-owned companies 4782 Femern A/S and Femern A/S Landanlaeg to construct and operate the link.

But work cannot start until the German federal government has completed a review of the overall economics of the project, which due to be completed by the autumn. The German state of Schleswig-Holstein has yet to grant formal construction approval.

Fehmarn Island is already connected by bridge to the German mainland and Lolland is already connected by a tunnel and bridges to Zealand over the island Falster.

Zealand is the most populated island in Denmark with a population just under 2.5 million, representing about 45% of the country's population.

The project would cut around 160km off the driving distance between the Danish capital Copenhagen and the major northern German port of Hamburg. Driving time between Copenhagen and Hamburg would be down to around 2.4 hours versus the more than four hours now.

For more information on companies in this article

Related Content

  • Road maintenance crisis hits UK and US, as experts gather in Paris
    January 9, 2015
    The road maintenance crisis in the United Kingdom and the United States is deepening amid estimates that it will take millions of dollars to stop highway infrastructure from crumbling, including falling prey to potholes. A recent report by the BBC in the UK said that at least one municipal council, the city of Leeds, is facing a bill of nearly US$153 million to patch up its potholed roads. In the United States, Senator Bernie Sanders is t
  • All change: get ready to rethink everything
    November 10, 2022
    How can we make our infrastructure ready for new sustainability challenges? What kind of investments are needed? And who will finance them? Tolling association Asecap has some thoughts. Geoff Hadwick reports from Lisbon
  • Tunnelling challenge on German project
    June 13, 2012
    A massive construction project has been underway deep in the heart of the Schnecktal valley area in Germany. From the surface, though, you would never be able to tell. The majority of the work is underground, as a joint-venture team led by German contractor Wayss and Freytag Ingenieurbau builds the nearly 7km long Finne Tunnel. After a few years of tunnel boring operations, the contractor is at work finishing the interior of the tunnel, slipforming first the tunnel’s floor and then a walkway with its GOMACO
  • German minister oversees huge Herrenknecht TBM tunnel deal for Wuhan, China
    April 28, 2014
    German Minister of Economy and Energy, Sigmar Gabriel, attended the signing of a prized contract for the delivery of two Herrenknecht tunnel boring machines (TBM) for a large multi-functional tunnel in the Chinese city of Wuhan.