Skip to main content

Danish-German Fehmarn Belt road and rail tunnel hits funding snag

A Danish newspaper has learned of a significant European Union funding gap for one of Europe’s most ambitious transportation road and rail projects. The Fehmarn Belt Fixed Link would connect the German island of Fehmarn with the Danish island of Lolland. A submersed tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea. Last February news emerged that contractors had revamped their cost estimates, adding nearly €1.2 billion to the project. This put the final cost of the 18
July 9, 2015 Read time: 3 mins
A Danish newspaper has learned of a significant 1116 European Union funding gap for one of Europe’s most ambitious transportation road and rail projects.

The Fehmarn Belt Fixed Link would connect the German island of Fehmarn with the Danish island of Lolland. A submersed tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea.

Last February news emerged that contractors had revamped their cost estimates, adding nearly €1.2 billion to the project. This put the final cost of the 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel, at just under €7.4 billion.

Business daily Dagbladet Borsen has now reported that the EU has given the project €590 million, far less than the €1 billion or so the Danes had expected and leaves a budget hole of more than €402 million.

However, Denmark’s former transport minister, Magnus Heunicke, said he hoped more money would be coming from the EU later on for the project that is expected to be open by 2024.

Borsen also reported that Denmark has another opportunity to apply for EU funds during the next application round in 2018, although no level of funding is guaranteed beforehand.

The new transport minister Hans Christian Schmidt will be under pressure to prepare for the new round, Borsen reported.

In April, the Danish parliament approved the Construction Act for the Danish section of the link which authorises construction of the tunnel. The act also authorises state-owned companies 4782 Femern A/S and Femern A/S Landanlaeg to construct and operate the link.

But work cannot start until the German federal government has completed a review of the overall economics of the project, which due to be completed by the autumn. The German state of Schleswig-Holstein has yet to grant formal construction approval.

Fehmarn Island is already connected by bridge to the German mainland and Lolland is already connected by a tunnel and bridges to Zealand over the island Falster.

Zealand is the most populated island in Denmark with a population just under 2.5 million, representing about 45% of the country's population.

The project would cut around 160km off the driving distance between the Danish capital Copenhagen and the major northern German port of Hamburg. Driving time between Copenhagen and Hamburg would be down to around 2.4 hours versus the more than four hours now.

For more information on companies in this article

Related Content

  • Mott MacDonald wins Erika storm damage repair work in Dominica
    August 16, 2017
    Mott MacDonald is providing design work for 20km of the Loubiere to Bagatelle road rehabilitation project in Dominica. The client, Dominica’s ministry of public works, is repairing the route following significant damage by tropical storm Erika in 2015. A grant from the UK’s Department for International Development has been provided to Dominica through the Caribbean Development Bank. Completion of works Mott MacDonald’s work is expected in 2019.
  • Australian state government does a deal with East West Connect
    April 15, 2015
    The state government of Victoria in Australia will pay the East West Connect consortium US$258 million to cancel construction of Melbourne’s East West Link road tunnel. The payoff is to cover the consortium's bidding, design and pre-construction costs and draw a line under the deal that has been mired in financial controversy for years. The federal government slammed Victoria’s decision to bail out of the project as “an obscenity’’ that will cost 7000 jobs, according to a report in The Australian news
  • Discussions in hand for proposed new Danish bridge project
    July 17, 2014
    In Denmark the Ministry of Transport has presented a proposal for hearing concerning a major new bridge link. The proposed structure would cross the Roskilde Fjord south of Frederikssund, partly replacing the existing Kronprins Frederik Bridge. The project is expected to cost €281.62 million, with partial financing from the Infrastructure Fund (Infrastrukturfonden). The rest will be sourced through road tolls. The Danish Construction Association has said that the project should also include the completion o
  • New Zealand ponders more tolling
    December 10, 2024

    New Zealand transport minister Simeon Brown is considering tolling seven new “Roads of National Significance” if that would speed their completion.

    Media reports noted that NZ Transport Agency Waka Kotahi (NZTA) said procurement and construction of the roads could start within the next three years.

    The projects are Belfast-to-Pegasus, the Hawke’s Bay Expressway, SH1 Cambridge-to-Piarere, State Highway 29 Tauriko, Takitimu North Link Stage 2, Mill Road and Warkworth-to-Wellsford.