Skip to main content

Danish-German Fehmarn Belt road and rail tunnel hits funding snag

A Danish newspaper has learned of a significant European Union funding gap for one of Europe’s most ambitious transportation road and rail projects. The Fehmarn Belt Fixed Link would connect the German island of Fehmarn with the Danish island of Lolland. A submersed tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea. Last February news emerged that contractors had revamped their cost estimates, adding nearly €1.2 billion to the project. This put the final cost of the 18
July 9, 2015 Read time: 3 mins
A Danish newspaper has learned of a significant 1116 European Union funding gap for one of Europe’s most ambitious transportation road and rail projects.

The Fehmarn Belt Fixed Link would connect the German island of Fehmarn with the Danish island of Lolland. A submersed tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea.

Last February news emerged that contractors had revamped their cost estimates, adding nearly €1.2 billion to the project. This put the final cost of the 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel, at just under €7.4 billion.

Business daily Dagbladet Borsen has now reported that the EU has given the project €590 million, far less than the €1 billion or so the Danes had expected and leaves a budget hole of more than €402 million.

However, Denmark’s former transport minister, Magnus Heunicke, said he hoped more money would be coming from the EU later on for the project that is expected to be open by 2024.

Borsen also reported that Denmark has another opportunity to apply for EU funds during the next application round in 2018, although no level of funding is guaranteed beforehand.

The new transport minister Hans Christian Schmidt will be under pressure to prepare for the new round, Borsen reported.

In April, the Danish parliament approved the Construction Act for the Danish section of the link which authorises construction of the tunnel. The act also authorises state-owned companies 4782 Femern A/S and Femern A/S Landanlaeg to construct and operate the link.

But work cannot start until the German federal government has completed a review of the overall economics of the project, which due to be completed by the autumn. The German state of Schleswig-Holstein has yet to grant formal construction approval.

Fehmarn Island is already connected by bridge to the German mainland and Lolland is already connected by a tunnel and bridges to Zealand over the island Falster.

Zealand is the most populated island in Denmark with a population just under 2.5 million, representing about 45% of the country's population.

The project would cut around 160km off the driving distance between the Danish capital Copenhagen and the major northern German port of Hamburg. Driving time between Copenhagen and Hamburg would be down to around 2.4 hours versus the more than four hours now.

For more information on companies in this article

Related Content

  • Cowi and Dissing+Weitling win Shenzhen and Zhongshan bridge deal
    April 18, 2016
    Engineering group Cowi and architecture firm Dissing+Weitling have won the tender for construction of a bridge and tunnel project to connect the Chinese cities of Shenzhen and Zhongshan. The US$5.51 billion 24km project in the southern province of Guangdong will include the world’s widest immersed road tunnel, two signature suspension bridges and two artificial islands. The road in the Pearl River Delta will have eight traffic lanes in two directions and a daily capacity of 90.000 cars, according to a
  • Texas route benefits from loan
    March 1, 2012
    Drivers in Texas using the SH161 route are set to benefit from a US$418 million loan being provided by the US Department of Transportation to complete work on the link.
  • $1.49 billion for Oregon-Washington bridge
    August 26, 2024
    The existing Interstate 5 bridge connecting Portland and Vancouver over the Columbia River in the US northwest is actually two parallel bridges – one dating back to 1917.
  • New Zealand lobbyists want tunnel from Panmure to Auckland
    May 13, 2016
    Lobby group New Zealand Council for Infrastructure Development has released a report assessing Auckland's congestion problem which costs the city about US$1.02 billion a year. The city’s increasing car gridlock will grind the economy to a halt, said Stephen Selwood, the group’s chief executive. However, part of the solution, according to the report, could be a major 11km road tunnel from the Panmure district to Auckland’s central business district. Selwood criticised Auckland city’s transport policy p