Skip to main content

Czech D35 section deal for Mott MacDonald

PricewaterhouseCoopers, Mott MacDonald, White & Case and SIEBERT + TALAŠ are part of the winning consortium for the Mohelnice-Opatovec stretch.
By David Arminas April 23, 2024 Read time: 2 mins
Mott MacDonald also recently developed a standardised economic appraisal methodology for road investment in the Czech Republic (image © Pytyczech/Dreamstime)

The consortium PricewaterhouseCoopers, Mott MacDonald, White & Case and SIEBERT + TALAŠ will be transaction advisor for the Mohelnice-Opatovec section of the D35 motorway project.

Another D35 award was recently handed to the consortium of Eurovia CZ, TuCon, and Eurovia SK for construction the 550m-long twin tube Homole Tunnel that will be part of the Ostrov-Vysoké Mýto section. The cost will be around €74.23 million.

Meanwhile, the 16.6km Staré Mesto-Opatovec and the 18.2km Mohelnice-Staré Mesto sections of the motorway are to be built under a public-private partnership at a cost of more than €1.27 billion.

Once all 260km of the D35 motorway - formerly Expressway R35 – are completed it will be the second longest highway in the Czech Republic, running from Úlibice to the D1 at the town of Lipník nad Bečvou. It is designed to be an alternative route to the D1 motorway between the capital city Prague and Olomouc and Ostrava.

Mott MacDonald also recently developed a standardised economic appraisal methodology for road investment in the Czech Republic based on HDM-4, the World Bank's Highway Development and Management software system for investigating choices in road transport infrastructure investment. The work was a component of Mott MacDonald's Technical Assistance to Programmes of Highway Construction and Reconstruction that is co-financed by the European Bank and the Czech government.

The principal elements of the system – developed in association with the UK's University of Birmingham – are the HDM-4 model and a software interface between the model and the established Road Data Bank of the Czech Republic. This interface – called ADAPTOR – enables the user to easily create HDM-4 input files.

Mott MacDonald conducted a major calibration exercise to adapt the HDM-4 model parameters to Czech conditions which involved research into traffic, road user effects, road deterioration and climate data.

A standardised appraisal system was built around a set of default parameter files for the vehicle fleet, maintenance and improvement standards, speed flow curves, traffic flow patterns and climate zones. A standard methodology was also developed for appraising different types of projects.

A system manual was then developed, comprising an appraisal guide, software users' guide and calibration guide. Users were trained at the University of Birmingham and in the Czech Republic.
 

For more information on companies in this article

Related Content

  • Landmark bridge for Italy?
    August 9, 2023
    The news that the Italian Government is once again considering building a bridge spanning the Messina Strait is of major significance for the construction sector, as well as for the country.
  • Cameroon highway loan package agreed
    June 29, 2021
    A loan package has been agreed for a highway project in Cameroon.
  • Czech motorway building to be accelerated in 2017
    December 12, 2016
    The Czech government is to speed up motorway building in 2017, with 140km of new roads planned. The announcement comes as the country is looking at a new laws designed to streamline infrastructure tendering and to improve construction management, according to CIJ – Construction and Investment Journal. Projects can sometimes take as long as 12 years to get off the ground, the journal reported. Skanska boss Michal Jurka, the head of Skanska in the Czech Republic and Slovakia since September, said p
  • Kazakhstan needs road repairs
    November 22, 2021
    Kazakhstan’s road network needs extensive repairs.