Skip to main content

Cutting congestion in Colombia’s capital with combined connectivity concept

A new transport plan for Colombia’s capital, Bogota, is intended to cut congestion. The plans are being drawn up by Bogota council's Urban Development Institute (IDU). In all 75 separate works are included in the plan, ranging from building or upgrading 155km of roads to constructing 183km of cycle lanes. Of the 75 works outlined in the plans, the aim is for 20 to be complete by the end of 2019. The IDU estimates that the work will cost US$5.5 billion to carry out. Upgrades to the Avenida Ferrocarril shoul
January 16, 2019 Read time: 2 mins

A new transport plan for Colombia’s capital, Bogota, is intended to cut congestion. The plans are being drawn up by Bogota council's Urban Development Institute (IDU). In all 75 separate works are included in the plan, ranging from building or upgrading 155km of roads to constructing 183km of cycle lanes. Of the 75 works outlined in the plans, the aim is for 20 to be complete by the end of 2019.

The IDU estimates that the work will cost US$5.5 billion to carry out. Upgrades to the Avenida Ferrocarril should be completed in the first quarter of 2019, while a new bridge Calle 183 and the Autopista Norte highway will be completed in the first half of 2019. Another bridge will be built between Calle 183 and Avenida Boyaca. Other projects to be completed in the first half of 2019 include work to Avenida La Sirena, Avenida Mutis and Avenida El Rincon. This last includes upgrades 2.8km of road and adding 2.1km of cycle lanes for example. One of the biggest projects for the first half of 2019 will be the project to improve 20km of the Carrera 7 corridor, which includes building 11km of cycle lanes.

Related Content

  • US$2 billion road projects for Colombia
    December 19, 2024
    Road projects worth US$2 billion are ongoing for Colombia.
  • New tunnel for Colombian capital
    February 3, 2014
    Pre -feasibility studies are commencing for a new tunnel project in Colombia capital Bogota. The tunnel is set to link Bogota’s north side with La Calera and the studies should be completed by April 2014. The project is expected to cost in the region of US$198.76 million to construct and will be for a 4.5km tolled tunnel. The project will be challenging however and will take up to four years to complete. The route will run from Street 170 in northern Bogota, linking the Perimetral Oriental ring road that is
  • Colombia road tolling contract
    June 20, 2016
    DEVISAB recently awarded a major contract to modernise the control centre and renew three toll plazas on a highway linking the municipality of Chia with Girardot and Soacha, west of capital Bogota Indra already has a strong position in the Colombian infrastructure and transport industry. The firm operates flagship projects such as the Bogota-Villavicencio divided highway and the Medellin urban mobility system The contract is to renovate the technology used at three toll plazas and a control centre fo
  • Consultation soon for Vancouver area’s Massey Tunnel replacement
    September 19, 2019
    The Canadian province of British Columbia could put options for a Massey Tunnel replacement out to consultation late this year or early next. A statement from the BC ministry of transportation and infrastructure said the government is in discussions with various stakeholders about which options it will put out for consultation. Whatever option is chosen to replace the ageing four-lane Massey Tunnel – be it a bridge or another tunnel – it will be will be either six or eight lanes, according to the gove