Skip to main content

Croatia’s Peljesac Bridge progressing

China Road and Bridge Corporation is working through the pandemic period.
By David Arminas June 11, 2020 Read time: 2 mins
CRBC started construction in the Bay of Mali Ston in January 2019 (photo courtesy of Hrvatske ceste/Croatian Roads Authority)

The first pier for Croatia’s Peljesac Bridge is rising above the waterline of the Bay of Mali Ston, according to reports by Croatian media.

The bridge is being built by China Road and Bridge Corporation (CRBC), part of the Chinese state-owned China Communications Construction Company.  CCCC was formed through the merger of CRBC and China Harbour Engineering in 2005.

CRBC started construction in the bay in January 2019. The contract, a US$340m project, is the first time that a Chinese company had won a bid for a project funded by the European Union. It is also part of China’s Belt and Road Initiative to fund and construct major infrastructure between China through Asia to the Middle East, Africa and Europe.

Strabag, which bid for the project, was chosen for only the access roads to the bridge and cited unfair competition by a state funded company. The major issue was CRBC’s bid being around 20% cheaper than Strabag’s bid. A legal challenge to have the contract overturned was unsuccessful.

Croatian media recently reported that prime minister Andrej Plenkovic, the minister of transport and other cabinet members visited the construction site. Plenkovic praised the workers and companies for using safe working methods during the ongoing pandemic.

Around 80% of the cost will be co-financed by the European Commission’s body for large infrastructure projects, JASPERS - Joint Assistance to Support Projects in European Regions.

According to construction plans accepted in 2007, the project is for a 21m-wide cable-stayed bridge carrying four lanes across the entrance to Mali Ston Bay. The main span would be 568m and likely be the second largest in Europe. The two main pylons would reach 170m above sea level.

The project also calls for access roads at both sides of the bridge. Work would include two tunnels on Pelješac island - one nearly 2.2km long and the other at 450m - as well as two smaller bridges on Pelješac, one 500m long and the other only 50m.

Once completed, this bridge would physically link Peljesac to mainland Croatia, which is now interrupted by a strip of land belonging to Bosnia and Herzegovina.

Start of construction had been continuously delayed until shipping rights and boundaries were better defined between the two countries.

There had been concerns by Bosnia about possible obstruction of cargo ships bound into the bay for the Bosnian city of Neum. The Bosnian government is planning to upgrade the infrastructure of Neum, the only Adriatic Sea access for Bosnia along its brief 20km of coastline.

For more information on companies in this article

Related Content

  • New Pakistan motorway routes
    November 12, 2024
    New Pakistan motorway routes will be built under the PPP model.
  • Bosnian road dispute
    February 29, 2012
    A legal tussle is unfolding in Bosnia over the Sarajevo Ringroad project.
  • Highway developments to boost east-west transport
    February 16, 2012
    Huge highway developments are being planned and carried out to further improve East-West transport, with Central Asia a key region as Patrick Smith reports
  • Poland’s A1 section Pyrzowice to Tuszyn clears another hurdle
    November 11, 2014
    The Polish province of Lodzkie has signed a territorial contract that will allow construction of the Pyrzowice to Tuszyn section of the national A1 motorway. Territorial contracts are agreements between the central and regional governments in order to allow investment in key projects, such as roads. Around 90 projects worth in total US$7.63 billion will benefit from the contract. Apart from the 140km A1 motorway section, projects include rail line upgrades, Wielun and Belchatow ring roads hospital extensio