Skip to main content

Cowi and Dissing+Weitling win Shenzhen and Zhongshan bridge deal

Engineering group Cowi and architecture firm Dissing+Weitling have won the tender for construction of a bridge and tunnel project to connect the Chinese cities of Shenzhen and Zhongshan. The US$5.51 billion 24km project in the southern province of Guangdong will include the world’s widest immersed road tunnel, two signature suspension bridges and two artificial islands. The road in the Pearl River Delta will have eight traffic lanes in two directions and a daily capacity of 90.000 cars, according to a
April 18, 2016 Read time: 4 mins
The artificial island will have 15,000m2 of conference, office and restaurant facilities (courtesy of Cowi)
Engineering group 2349 Cowi and architecture firm Dissing+Weitling have won the tender for construction of a bridge and tunnel project to connect the Chinese cities of Shenzhen and Zhongshan.

The US$5.51 billion 24km project in the southern province of Guangdong will include the world’s widest immersed road tunnel, two signature suspension bridges and two artificial islands.

The road in the Pearl River Delta will have eight traffic lanes in two directions and a daily capacity of 90.000 cars, according to a statement by Cowi.

At the moment, Humen Bridge is the only span connecting both sides of the delta. Although it was opened only in 1997, it is heavily congested. It consists of two main spans - a suspension bridge section and a segmental concrete section. It connects the Nansha District of Guangzhou to Humen Town of Dongguan. The suspension bridge has a main span of 888m and the segmental concrete section's main span of 270m is one of the longest such spans in the world.
 
The competition for a new crossing was organised last September by The Advanced Work Office for the ShenZhong Link Project. Cowi and Dissing+Weitling are based in Denmark.

“I simply knew from the first glance, that I was looking at an extraordinary project," said Lars Hauge, regional vice president of Cowi.
 
"One of our primary advantages as a team is that we have vast experience both with large suspension bridges, immersed tunnels and marine engineering. Moreover we have had an excellent teamwork with the architect DISSING + WEITLING Architecture, with whom we have a long-standing and excellent working relationship.”

Among other projects that Cowi and Dissing+Weitling have collaborated on is the Danish fixed link, an 18km crossing of the Great Belt linking the eastern and western parts of Denmark.

Both companies were also deeply involved in the Öresund Bridge linking Copenhagen with Malmoe, Sweden, as well as the Hong Kong – Zhuhai – Macao link, now under construction.
 
"The design is a synthesis of the requirements and constraints of the Pearl River's estuary where shallow and calm water has been a great inspiration calling for elegance and harmony. The island is designed to minimise blocking effect in the water, the shape similar to a classic Chinese kite and combined with the bridges, the entire link can visualise a kite with tail elegantly landing on the water," said Poul Ove Jensen, architect in Dissing+Weitling.
 
In their comments the jury said that the “the whole link is in harmony with the surrounding environment, the Y shaped pier shaft of approach bridges give a very strong sense of rhythm".

Guangdong is one of the richest provinces in China. Besides agriculture and marine products, the strong provincial economy is based largely on light and heavy industries which the Chinese authorities believe will benefit from a better road link.

The new link will be part of this upgrade in and around Guangdong and the Pearl River Delta. Among other advantages, it will create a more direct connection between the western and the northern parts of the river and should decrease the traffic through Guangdong.

•    The 24km ShenZhong Link will be the widest immersed tunnel in the world, with the widest road bores ever built, between 19m and 38m.

•    The longest suspension bridges have a bridge span of 1,588m and a twin box girder to enable optimal wind stability

•    The proposed concept is for a post-tensioned segmental tunnel consisting of 31 elements. A typical element will be 18m long and the widest being up to 70m wide.

•    The artificial island will have a promenade and host 15,000m2 of conference, office and restaurant facilities.

For more information on companies in this article

Related Content

  • Fehmarn tunnel cleared for construction
    October 18, 2021
    The 17.6km Fehmarnbelt tunnel will be between Germany and Denmark.
  • China to set up “international courts” for Belt and Road disputes
    February 6, 2018
    China plans to set up an “international court” for settling disputes among companies participating in Belt and Road transportation infrastructure work, according to Chinese media. The Global Time newspaper – with strong links to the communist government – reported that Chinese companies are facing more foreign-related lawsuits as they step up investment and business in countries covered by Beijing’s Belt and Road Initiative. The report called Belt and Road “a brainchild of Xi”, referring to Xi Jinping
  • Ireland and Scotland link?
    March 1, 2018
    Politicians in Northern Ireland have again raised the prospect of bridge to link western Scotland the Irish island, according to media reports. The road and rail crossing as envisaged by the Democratic Union Party would cost close to €23 billion. It would run between the Irish town of Larne in County Antrim and the Dumfries and Galloway coastline in Scotland. The DUP said in its manifesto for the 2015 UK general election that there should be a feasibility study into building a bridge or tunnel.
  • The UK’s Humber Bridge gets protected status
    July 28, 2017
    Any refurbishments to the Humber Bridge near the northern English city of Hull will be subject to intense scrutiny after being designated a historic site. The bridge - only 36-years old – was the longest single-span suspension bridge for 16 years until it was surpassed in 1998 with completion of Japan’s Akashi Kaikyō Bridge with a main span of 1.9km. The Humber Bridge now ranks eighth-longest as measured by its main span of 1.4km. Historic England, the listed structures designating authority, described the