Skip to main content

Costs revised for Denmark’s proposed Kattegat Bridge

A proposed bridge across the Kattegat Sea in northern Europe would be cheaper for the Danish government than previously expected, according to an engineering report. The bridge between Denmark’s Jutland and Zealand islands would need around €2.02 billion in government subsidies, noted the report from Danish engineering consultancy Rambøll. A previous report from the Ministry of Transport concluded that subsidies would have to be around €6.85 billion and need to be financed by loans. This caused the mi
May 9, 2016 Read time: 3 mins
A proposed bridge across the Kattegat Sea in northern Europe would be cheaper for the Danish government than previously expected, according to an engineering report.

The bridge between Denmark’s Jutland and Zealand islands would need around €2.02 billion in government subsidies, noted the report from Danish engineering consultancy Rambøll.

A previous report from the Ministry of Transport concluded that subsidies would have to be around €6.85 billion and need to be financed by loans. This caused the ministry to shelve the planning process for the bridge which would have been open by 2030.

The Kattegat is a shallow 30,000km2 sea between Denmark and Sweden’s southwest coast. It can be very difficult and dangerous to navigate because of many reefs and shifting currents. Nonetheless, the Kattegat is an important commercial navigation passage as well as a popular summer vacation area.

The proposed Kattegat Bridge – in effect, two sections – would cover 35km to link Jutland and Zealand and possibly have a rail line.

The ministry’s report expected average traffic growth would be 1.25% annually between 2020 and 2030, with loan rates or around 3%.

However, Rambøll’s assessment is based on traffic increases of around 2.2% annually and loan interest rates or 2%.

A new bridge would take some of the traffic from the nearby and often heavily congested Great Belt Fixed Link between the Danish islands of Zealand and Funen. The Great Belt consists of three structures: a road suspension bridge and a railway tunnel between Zealand and the small island Sprogø located in the middle of the Great Belt, and a box girder bridge for both road and rail traffic between Sprogø and Funen.

An earlier report by 6801 Ramboll, in July 2007, found that 60% of peope in a poll favoured construction of a bridge over the Kattegat, up from 47% earlier that year. Ramboll also commented at the time that people were “much more positive about a Kattegat project than the proposed Fehmarn Bridge”, according to a report by the Copenhagen Post newspaper.

The Fehmarn Belt Fixed Link will connect the German island of Fehmarn with the Danish island of Lolland. A 17km tunnel, including two railway tunnels, two motorway tunnels and an emergency tunnel, will cross the Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea. Both governments are putting the project together.

The Danish political parties behind the Fehmarnbelt link have mandated 4782 Femern A/S to appoint preferred bidders for the main tunnel work in order to enter into conditional contracts no later than mid-May.

Femern A/S is the Danish government-owned company managing the Fehmarn Belt immersed tunnel project between Denmark and Germany. It is supposed to be built, owned - apart from the German land works - and operated by Femern A/S, a subsidiary of Sund & Bælt Holding, and financed by loans guaranteed by the Danish government.

For more information on companies in this article

Related Content

  • Cowi wins Massey Tunnel design
    July 22, 2022
    Cowi has won a contract as owner's engineer for an eight-lane replacement immersed tunnel under the Fraser River near the Pacific coast city of Vancouver. Cowi said it will draw on its experience designing the original four-lane George Massey Tunnel in 1959 and whose removal the engineering firm will later oversee.
  • Sweden and Denmark consider link between Helsingør and Helsingborg
    July 2, 2018
    Sweden and Denmark are considering a fixed link between Helsingør and Helsingborg, either a a road, railway or road-rail. The link would cross The Øresund, a straight separating the two countries that is only 6.7km wide between the Danish city of Helsingør and the Swedish city of Helsingborg. Investigations, likely to cost around €2.3 million including €1 million from the European Union, will start this month with a final report by 2020.
  • Danish SolarFuture builds solar facility by Öresund Bridge
    January 10, 2018
    Solar cell panels worth around €270,000 will produce energy for the Øresund Bridge that connects Denmark and Sweden. Danish companies SolarFuture and Solarpark DK have been awarded the contract to install 1,500m² solar panels near the toll station of the Øresund Bridge. The three-year agreement is with Øresundsbro Konsortiet - the Danish-Swedish company that owns and operates the Øresund Bridge. The panel will generate around 4% of the power to operate the bridge, including deck lighting and
  • Denmark: construction of Storstrøm Bridge officially gets underway
    September 27, 2018
    Denmark’s Minister of Transport Ole Birk Olesen has turned the sod to officially start construction of the new 4km road and rail Storstrøm Bridge. The €549 million bridge is scheduled to open for road traffic in 2022 and for rail traffic in 2023. The project budget includes the cost for demolition of the existing bridge that opened in 1937. The 24m-wide single-support cable-stayed structure will connect the islands of Zealand to Falster and touch down on the smaller Masnedø Island.