Skip to main content

Costa Rica highway concession package cancelled

The Costa Rican Government is paying compensation worth US$28.4 million for the cancellation of a highway concession package. The compensation relates to the San José-San Ramón highway concession and is being paid to the Brazilian construction company OAS, reports Business News Americas. This follows a legal dispute over the project and is some $10 million less than OAS originally claimed in compensation. The 30 year concession package was cancelled last year due to opposition. There were allegations of a c
March 19, 2014 Read time: 2 mins
The Costa Rican Government is paying compensation worth US$28.4 million for the cancellation of a highway concession package. The compensation relates to the San José-San Ramón highway concession and is being paid to the Brazilian construction company 1511 OAS, reports Business News Americas. This follows a legal dispute over the project and is some $10 million less than OAS originally claimed in compensation. The 30 year concession package was cancelled last year due to opposition. There were allegations of a conflict of interest in the award of the contract as well as complaints the proposed toll fees would be too high. The project for the $524 million project to upgrade and widen the 58km section of highway was originally expected to have been complete within a 30 month time slot. Under the terms of the agreement, OAS will provide the Costa Rica Government with all the plans, studies and technical documents carried out for construction of the link. The payment will be funded by the national roads council 2538 Conavi. The El Foro de Occidente group opposed to the original concession has now set out plans for a $478 million alternative proposal in coordination with the 2536 Ministry of Public Works and Transport, MOPT and Conavi. This includes a lower toll fee of $2.23, instead of the $3.90 OAS had proposed.

For more information on companies in this article

Related Content

  • Brazilian authorities award tollroad package
    December 18, 2013
    The authorities in Brazil have awarded an important tollroad package for the BR-163 Federal Highway. This route runs through Brazil's mid-western state of Mato Grosso do Sul and the 30 year concession for the 847km of highway was won by tollroad firm CCR, according to Business News Americas. The concession package is worth some US$2.78 billion and was awarded on the basis of the low toll charges CCR will introduce on the route. The project requires widening the road along a 130km stretch within 12 months of
  • Costa Rica transport connection upgrade
    June 12, 2019
    A proposed upgrade to the road connecting Costa Rica’s capital San Jose with nearby Cartago has been put forward. The project would cut journey times to just 30 minutes. The current route is known for its traffic delays, handling around 51,000 vehicles/day. The new route would feature a 3.2km section of flyover and the estimated cost is US$400 million. Should the project get the go ahead, work would commence in early 2021 and should take around two years to complete.
  • Costa Rican government targets Chinese loan to build major motorway
    October 16, 2013
    A 107km road section between San Jose and Limon in Costa Rica could be transformed into a large four-lane motorway using a loan from China of US$395.7 million. The Costa Rican government could add $89 million to the loan, creating a large project budget of $485 million. President Laura Chinchilla has referred the project to the Costa Rican Congress for approval. Chinese firm CHEC will work on the design of this motorway over the next eight months. The project could be finished in three and a half years.
  • Costa Rica road repairs
    October 6, 2022
    Costa Rican road repairs are planned.