Skip to main content

Costa Rica highway concession package cancelled

The Costa Rican Government is paying compensation worth US$28.4 million for the cancellation of a highway concession package. The compensation relates to the San José-San Ramón highway concession and is being paid to the Brazilian construction company OAS, reports Business News Americas. This follows a legal dispute over the project and is some $10 million less than OAS originally claimed in compensation. The 30 year concession package was cancelled last year due to opposition. There were allegations of a c
March 19, 2014 Read time: 2 mins
The Costa Rican Government is paying compensation worth US$28.4 million for the cancellation of a highway concession package. The compensation relates to the San José-San Ramón highway concession and is being paid to the Brazilian construction company 1511 OAS, reports Business News Americas. This follows a legal dispute over the project and is some $10 million less than OAS originally claimed in compensation. The 30 year concession package was cancelled last year due to opposition. There were allegations of a conflict of interest in the award of the contract as well as complaints the proposed toll fees would be too high. The project for the $524 million project to upgrade and widen the 58km section of highway was originally expected to have been complete within a 30 month time slot. Under the terms of the agreement, OAS will provide the Costa Rica Government with all the plans, studies and technical documents carried out for construction of the link. The payment will be funded by the national roads council 2538 Conavi. The El Foro de Occidente group opposed to the original concession has now set out plans for a $478 million alternative proposal in coordination with the 2536 Ministry of Public Works and Transport, MOPT and Conavi. This includes a lower toll fee of $2.23, instead of the $3.90 OAS had proposed.

For more information on companies in this article

Related Content

  • Financing model confirmed for German Autobahn
    June 27, 2016
    The refinancing package for Germany’s A8 Autobahn has now been formalised. The section of the A8 runs between Ulm and Augsburg in the south of Germany and is operated by concession firm Pansuevia, a 50:50 partnership between HOCHTIEF and STRABAG. The 58 km section of the A8 between Ulm and Augsburg was opened to traffic on schedule in September 2015 after four years of construction. PANSUEVIA designed, financed, and carried out the widening of the section to six lanes and took over maintenance and operation
  • Positive finding for tunnel solution in Malta
    May 2, 2012
    A preliminary study on the proposed tunnel connecting the islands of Malta and Gozo has been carried out by Mott Macdonald. Mott Macdonald’s preliminary analysis of the Malta-Gozo undersea road link suggests that it would take 5-7 years to build a tunnel between the two islands. This report suggests a cost of €156-€492 million for a single bore three-lane tunnel on the shortest practical alignment route. Potentially, the project could be co-financed by the EU under the Cohesion Fund if a road tunnel link be
  • Norway’s new ‘green’ highway route
    November 13, 2020
    A new route in Norway will provide a faster and greener highway connection between the capital city Oslo and the northern city of Trondheim
  • Croatia’s Pelješac Bridge to open mid-year
    February 8, 2022
    China’s CRBC started construction on the bridge in 2019 amid concerns by European construction companies of price dumping.