Skip to main content

Cost soars for Bangladesh’s Karnaphuli River Tunnel

Amid concern over cost rises, Bangladesh has issued a request for expression of interest to engage a consultant for the proposed the Karnaphuli River Tunnel. The estimated cost to build the Karnaphuli Tunnel has risen by US$205 million, according to the government’s Bridge Authority. A report in the Financial Express newspaper said the original 2km tunnel proposal was prepared two years ago based on a feasibility study. According to Bridge Authority officials, the cost to build the 3.4km tunnel has ri
April 14, 2015 Read time: 2 mins
Amid concern over cost rises, Bangladesh has issued a request for expression of interest to engage a consultant for the proposed the Karnaphuli River Tunnel.

The estimated cost to build the Karnaphuli Tunnel has risen by US$205 million, according to the government’s Bridge Authority.

A report in the Financial Express newspaper said the original 2km tunnel proposal was prepared two years ago based on a feasibility study. According to Bridge Authority officials, the cost to build the 3.4km tunnel has risen 8% a year and it is expected to grow further on the preparation of the project design.

Cost estimates did not include almost $130 million in customs duty and VAT – value added tax - along with the cost to purchase 18 hectares of land for a workers’ camp and a construction site including a jetty. Inflationary pressure was also cited as one of the contributors to the growing cost.

China Communication Construction Company is responsible for building the tunnel under a government-to-government agreement.

The Karnaphuli River divides the Chittagong district and three bridges already serve the region. But traffic growth is putting pressure on the infrastructure, according to the website of the Bridge Authority.

Chittagong at the mouth of the river is Bangladesh’s main sea port and largest commercial city that sees most of the country’s export and import activities. The tunnel would connect directly with the Dhaka-Chittagong-Cox Bazar Highway.

Width of the river at the site of the proposed tunnel is 700m and the water depth is between 9-11m. The indicative length of the proposed Tunnel is 2000 meters.

Related Content

  • Tyne tunnel's water quality checks
    February 6, 2012
    Five buoy-mounted automatic water quality monitors (AWQMs) have been installed by YSI Hydrodata engineers at the new Tyne Tunnel project in north-east England. The equipment on the second vehicle tunnel under the River Tyne, currently one of the UK's largest construction projects, aims to ensure that construction operations do not significantly affect river water quality. Unusually, the contractors have not taken ownership of the instrumentation, preferring instead to simply purchase the data and alarms. Th
  • Sourcing road financing for East Africa’s network expansion
    December 4, 2015
    East Africa’s ambitious road expansion programme is seeing the network expand significantly – Shem Oirere writes The East Africa countries of Kenya, Tanzania, Uganda and Rwanda have announced ambitious road sector expansion plans in the 2015/16 financial year. This is despite their national budgets being weighed down by huge deficits and persisting lack of capacity to spend resources allocated to the sector in previous years. With the huge budget deficits, the countries will have to look for alternati
  • Traffic control to beat congestion
    November 6, 2012
    Max Lay discusses how congestion has posed problems throughout history from early civilisation to the present day One of the earliest known human settlements was at the Springs of Elisha at Jericho. Inevitably, locals collecting fresh water from the springs would encounter other water carriers. When a path was too narrow, or access to it was too limited, or it crossed another path, some carriers would find it necessary to stand aside for others. Priority in such cases might be based on common courtesy and p
  • Shortlist set for Norway’s Sotra PPP project
    May 21, 2020
    Sotra Link, Itias and Vis Sotra are vying for the $1.15 billion deal.