Skip to main content

Cost soars for Bangladesh’s Karnaphuli River Tunnel

Amid concern over cost rises, Bangladesh has issued a request for expression of interest to engage a consultant for the proposed the Karnaphuli River Tunnel. The estimated cost to build the Karnaphuli Tunnel has risen by US$205 million, according to the government’s Bridge Authority. A report in the Financial Express newspaper said the original 2km tunnel proposal was prepared two years ago based on a feasibility study. According to Bridge Authority officials, the cost to build the 3.4km tunnel has ri
April 14, 2015 Read time: 2 mins
Amid concern over cost rises, Bangladesh has issued a request for expression of interest to engage a consultant for the proposed the Karnaphuli River Tunnel.

The estimated cost to build the Karnaphuli Tunnel has risen by US$205 million, according to the government’s Bridge Authority.

A report in the Financial Express newspaper said the original 2km tunnel proposal was prepared two years ago based on a feasibility study. According to Bridge Authority officials, the cost to build the 3.4km tunnel has risen 8% a year and it is expected to grow further on the preparation of the project design.

Cost estimates did not include almost $130 million in customs duty and VAT – value added tax - along with the cost to purchase 18 hectares of land for a workers’ camp and a construction site including a jetty. Inflationary pressure was also cited as one of the contributors to the growing cost.

China Communication Construction Company is responsible for building the tunnel under a government-to-government agreement.

The Karnaphuli River divides the Chittagong district and three bridges already serve the region. But traffic growth is putting pressure on the infrastructure, according to the website of the Bridge Authority.

Chittagong at the mouth of the river is Bangladesh’s main sea port and largest commercial city that sees most of the country’s export and import activities. The tunnel would connect directly with the Dhaka-Chittagong-Cox Bazar Highway.

Width of the river at the site of the proposed tunnel is 700m and the water depth is between 9-11m. The indicative length of the proposed Tunnel is 2000 meters.

Related Content

  • Montreal’s new Champlain Bridge is shaping up for Christmas
    September 10, 2018
    Montreal’s Champlain Bridges - one going up, one coming down, reports David Arminas The importance of the new Champlain Bridge to Montreal and Canada can’t be overstated, given the crumbling nature of the not-so-old original Champlain Bridge. The original steel truss affair across the St Lawrence River and the adjacent St Lawrence Seaway canal is “a lifeline for residents and businesses” in greater Montréal, according to the national Auditor General - the public sector spending watchdog. “It accommodates
  • Vancouver eyes bridge, tunnel options
    September 25, 2020
    The Burrard Inlet Rapid Transit Study has listed five potential crossings.
  • Costa Rica to replace Conavi with a National Infrastructure Institute
    March 14, 2016
    Amid concerns over the efficiency of Costa Rica’s highways agency Conavi, the authority has been given more time to provide details on expansion of Route 32, according to the La Republica newspaper. Conavi has been at loggerheads with the Treasury Inspector's Office which wants Conavi to move faster and authorise a contract for the expansion of road between Rio Frio and Limon granted to China Harbour Engineering Company. China Harbour has been requesting further details about the US$395 million projec
  • Bangladesh expressway project under development
    November 20, 2018
    Progress is being seen in Bangladesh on the project for a new expressway connecting the capital Dhaka with the second city, Chittagong.