Skip to main content

Contracts awarded for India’s sea crossing

Further progress is being made with the project to build the 17.2km sea crossing in Mumbai. India.
July 2, 2019 Read time: 1 min

Further progress is being made with the project to build the 17.2km sea crossing in Mumbai. India. The contract to build the structure has been awarded to Reliance Infrastructure. Measuring 17.2km long, the new bridge will connect Versova with Bandra and its construction is expected to take around 60 months. The aim of the project is to reduce the chronic congestion that afflicts Mumbai, particularly at peak periods. This will cut journey times from 90 minutes at present to just 10 minutes once the link opens to traffic. Building the sea crossing is expected to cost US$946 million. Maharashtra State Road Development Corporation (MSRDC) is overseeing the project and will announce the location of the yard where the bridge components will be cast in due course.

Related Content

  • New Thames Tunnel plans revealed
    April 12, 2017
    Plans have finally been revealed for the new Lower Thames Crossing, situated to the east of UK capital London.
  • India’s massive sea bridge project
    December 11, 2017
    The contract has been awarded for a 7.8km sea bridge across the Mumbai Bay in India. A joint venture team comprising Daewoo E&C and Tata Projects will carry out the design and construction for the US$865.2 million Mumbai Trans Harbour Link. The partners will also construct the Shivaji Nagar Interchange located at Navi Mumbai. Once the Mumbai Trans Harbour Link is complete, it will be India’s biggest sea-bridge.
  • London Lower Thames Crossing link
    October 10, 2018
    Progress is being made with regard to the proposed Lower Thames Crossing project close to London.
  • Design contract awarded for Indian bridge project
    March 26, 2018
    A major design contract has been awarded for a key bridge project in India. Consulting engineer COWI has been awarded the contract for the detailed design of the 10.3km Package 1 section of the new link. Meanwhile the Danish consultant Rambøll is to carry out work on the design for the 7.8km Package 2 section of the Mumbai Trans Harbour Link (MTHL). The Owner for MTHL is Mumbai Metropolitan Region Development Authority (MMRDA) The 22km link will be India's longest sea bridge and is expected to cost around