Skip to main content

Construction commencing on Pennsylvania highway stretch

Construction is commencing on a 4.4km stretch of the Southern Beltway in the US state of Pennsylvania. This forms part of a project for a 21km section of toll road, with its completion expected in 2022. The entire project is for the extension of the Southern Beltway from the Turnpike 576 terminus at US Route 22 in Robinson Township, to a new interchange with Interstate 79 at the Allegheny-Washington County line. The work is needed to boost capacity and improve transport, while cutting congestion for drivers
November 16, 2018 Read time: 2 mins
Construction is commencing on a 4.4km stretch of the Southern Beltway in the US state of Pennsylvania. This forms part of a project for a 21km section of toll road, with its completion expected in 2022. The entire project is for the extension of the Southern Beltway from the Turnpike 576 terminus at US Route 22 in Robinson Township, to a new interchange with Interstate 79 at the Allegheny-Washington County line. The work is needed to boost capacity and improve transport, while cutting congestion for drivers in the area. The project provides an extension for the existing stretch of Beltway connecting Pittsburgh International Airport and US 22 to Interstate 79.


The work has been split into nine sections for the construction process. Two are complete and work is underway on another four. The project includes building an overpass and three smaller bridges, as well as a 420m bridge with five spans.

Related Content

  • Concrete paving a smoother surface using machine control technology
    May 17, 2017
    Innovative technology has been used to deliver a smooth concrete road surface on a busy stretch of highway in Nebraska. Much-needed work on a busy section of Interstate 80 has been carried out in Nebraska to improve the road surface. This is one of the most important highways in the US, providing a link that stretches right across the country between the east and west coasts. This busy highway carries a high percentage of heavy truck traffic as it is a vital transport route. However this constant flow of la
  • €261 million Slovakia road works
    July 17, 2025
    A €261 million Slovakia road project is going ahead.
  • US$417 million loan for North Carolina toll road upgrade
    February 20, 2024
    A US$417 million loan will help pay for a key North Carolina toll road upgrade.
  • Highway project in Texas required demolition equipment
    May 1, 2018
    A contractor in Texas has used equipment from Brokk to help out with a tricky highway project. Upgrading work has been carried out on a 6.4km-long stretch of I-35 in San Antonio between Loop 410 NE and Loop 410 S. This stretch of the route was carrying around 185,000 vehicles/day and was suffering increasing levels of congestion at peak periods. Travel times lengthened by 65% during rush hour, while ramps on opposite sides of the interstate caused additional congestion and safety issues. In one section, t