Skip to main content

Consortium to build another Dunajec River crossing near Nowy Sacz

A Polish-Hungarian consortium has signed a €44 million contract to construct a bridge over the Dunajec River near the southern Polish town of Nowy Sacz. Przedsiebiorstwo Wielobranzowe Banimex, from Poland, and Hungarian contractor Hodmezovasarhelyi Utepito Korlatolt Felelossegu will build the bridge within 25 months, according to Polish media reports. Nowy Sącz is at the confluence of the Kamienica and Dunajec rivers , about 20km north of the border with Slovakia and in the Sądecka Valley.
June 14, 2019 Read time: 1 min

A Polish-Hungarian consortium has signed a €44 million contract to construct a bridge over the Dunajec River near the southern Polish town of Nowy Sacz.

Przedsiebiorstwo Wielobranzowe Banimex, from Poland, and Hungarian contractor Hodmezovasarhelyi Utepito Korlatolt Felelossegu will build the bridge within 25 months, according to Polish media reports.

Nowy Sącz is at the confluence of the Kamienica and Dunajec rivers , about 20km north of the border with Slovakia and in the Sądecka Valley.

The new 600m-long 17m-wide crossing will replace a 407m-long 7.5m-wide bridge built near the town of Kurow in 1943.

The old bridge is being replaced reportedly because of its narrow width that congests traffic, as well as because of structural concerns.

Related Content

  • Contractor STRABAG is building Poland’s S8 route
    February 9, 2016
    Austrian contractor STRABAG is now working on designing and building the new S8 route in Poland. This €57 million project will provide a new 10km route connecting Radziejowice and Przeszkoda. The road is being built from concrete and is due for completion within 31 months. The project was awarded to STRABAG by Poland’s General Directorate for National Roads and Highways (GDDKiA). In addition to building the dual carriageway, the work also involves constructing the Żabia Wola junction as well as several stru
  • Poland lines up tenders until 2023
    November 7, 2018
    A Polish parliamentary commission has heard that €11.14 billion of road investment within the 2014-23 programme of upgrades has yet to be tendered. This past summer, the government announced that a bridge on the San River near Jarosław will be the first of 22 to be constructed under the Polish government’s Bridges for Regions programme. Central government will fund around 80% or the programme that is expected to cost about €534 million, said Mateusz Morawiecki, the prime minister.
  • Bridge design using flow modelling techniques
    February 17, 2012
    SBG has set numerous engineering precedents with its hugely innovative Jamarat Bridge project in Saudi Arabia
  • Germany tunnel and bridge projects being discussed
    February 27, 2018
    Projects to improve historic tunnel and bridge links are now progressing in Germany after some delays. These are for the refurbishment of the old Elbe Tunnel in Hamburg and a bridge upgrade in Cologne. Stretching some 426m, the Old Elbe Tunnel runs from the St Pauli area on the north of the River Elbe to the port area in the south. Opened in 1911 the twin tube tunnel is of historic value, even though its importance for vehicle traffic is now comparatively minor following the opening of a new road tunnel in