Skip to main content

Consortium to build another Dunajec River crossing near Nowy Sacz

A Polish-Hungarian consortium has signed a €44 million contract to construct a bridge over the Dunajec River near the southern Polish town of Nowy Sacz. Przedsiebiorstwo Wielobranzowe Banimex, from Poland, and Hungarian contractor Hodmezovasarhelyi Utepito Korlatolt Felelossegu will build the bridge within 25 months, according to Polish media reports. Nowy Sącz is at the confluence of the Kamienica and Dunajec rivers , about 20km north of the border with Slovakia and in the Sądecka Valley.
June 14, 2019 Read time: 1 min

A Polish-Hungarian consortium has signed a €44 million contract to construct a bridge over the Dunajec River near the southern Polish town of Nowy Sacz.

Przedsiebiorstwo Wielobranzowe Banimex, from Poland, and Hungarian contractor Hodmezovasarhelyi Utepito Korlatolt Felelossegu will build the bridge within 25 months, according to Polish media reports.

Nowy Sącz is at the confluence of the Kamienica and Dunajec rivers , about 20km north of the border with Slovakia and in the Sądecka Valley.

The new 600m-long 17m-wide crossing will replace a 407m-long 7.5m-wide bridge built near the town of Kurow in 1943.

The old bridge is being replaced reportedly because of its narrow width that congests traffic, as well as because of structural concerns.

Related Content

  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.
  • Budimex and Strabag win 16km of Poland’s four-lane A1
    August 6, 2018
    Budimex and Strabag have won a contract to design and build 16km of Poland’s four-lane A1 highway between Tuszyn and Bełchatów. The €111 million deal with the Polish General Directorate for National Roads and Highways is scheduled for completion within 32 month, excluding winter months. The entire section will be concrete and includes two junctions, 17 bridges, several intersections and access roads, noise barriers and wildlife crossings.
  • £153 million East Anglia road deal for Skanska
    July 16, 2025
    Skanska has been awarded a £153 million East Anglia road deal.
  • Highway 407 Revisited – smart tollroad extension
    June 7, 2016
    In the late 1990s, World Highways published a supplement on construction of Canada’s Highway 407, the world’s first all-electronic toll road. But how successful has it been? David Arminas reports from Toronto The head office for 407 ETR Concession Company is a low-rise building next to exit 59, just north of Toronto, Canada’s economic powerhouse. The building may be non-descript but inside is the advanced technical heart of Highway 407 ETR – Express Toll Route. It houses the latest toll monitoring techno