Skip to main content

Consortium to build another Dunajec River crossing near Nowy Sacz

A Polish-Hungarian consortium has signed a €44 million contract to construct a bridge over the Dunajec River near the southern Polish town of Nowy Sacz. Przedsiebiorstwo Wielobranzowe Banimex, from Poland, and Hungarian contractor Hodmezovasarhelyi Utepito Korlatolt Felelossegu will build the bridge within 25 months, according to Polish media reports. Nowy Sącz is at the confluence of the Kamienica and Dunajec rivers , about 20km north of the border with Slovakia and in the Sądecka Valley.
June 14, 2019 Read time: 1 min

A Polish-Hungarian consortium has signed a €44 million contract to construct a bridge over the Dunajec River near the southern Polish town of Nowy Sacz.

Przedsiebiorstwo Wielobranzowe Banimex, from Poland, and Hungarian contractor Hodmezovasarhelyi Utepito Korlatolt Felelossegu will build the bridge within 25 months, according to Polish media reports.

Nowy Sącz is at the confluence of the Kamienica and Dunajec rivers , about 20km north of the border with Slovakia and in the Sądecka Valley.

The new 600m-long 17m-wide crossing will replace a 407m-long 7.5m-wide bridge built near the town of Kurow in 1943.

The old bridge is being replaced reportedly because of its narrow width that congests traffic, as well as because of structural concerns.

Related Content

  • Far from formulaic
    January 4, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford. RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
  • Date set to complete D1 Višňové Tunnel section
    July 20, 2023
    The D1 section between Lietavská Lúčka and Dubná Skala in Slovakia includes the partially completed 7.5km twin-tube Višňové Tunnel - to be the country's longest.
  • East End Crossing Project—Availability payment P3 in action
    July 14, 2017
    Indiana exercised its authority to use a P3 contract when it partnered with Kentucky for new bridges across the Ohio River. Barney Allison and John Smolen* explain the groundbreaking availability payment deal. Earlier this year, traffic began rolling over the new tolled Lewis and Clark Bridge spanning the Ohio River from northern Kentucky to southern Indiana. The cable-stayed bridge is part of the award-winning Ohio Bridges Project to untangle traffic within the greater metropolitan area of Louisville, Kent
  • Tanzania’s work on East Africa’s multi-national road project
    November 28, 2022
    Tanzania is kick-starting construction work on the missing link in East Africa's multinational road