Skip to main content

Consortium Via al Puerto to finish Colombia’s Buga-Buevantura road

Colombia’s National Infrastructure Agency (ANI) has approved Consorcio Estructura Plural Via al Puerto to build the remaining 26.5km of the Buga-Buenaventura dual carriageway. Construction costs will be just under US$358 million with another $645 million likely needed to maintain and operate the public-private partnership road for 30 years. Works include construction of two tunnels, 12 bridges, 7.5km of cycle lanes, as well as maintenance of 111km of the main road, according to a report by El Pais new
May 24, 2016 Read time: 2 mins
Colombia’s National Infrastructure Agency (ANI) has approved Consorcio Estructura Plural Via al Puerto to build the remaining 26.5km of the Buga-Buenaventura dual carriageway.

Construction costs will be just under US$358 million with another $645 million likely needed to maintain and operate the public-private partnership road for 30 years.

Works include construction of two tunnels, 12 bridges, 7.5km of cycle lanes, as well as maintenance of 111km of the main road, according to a report by El Pais newspaper.

The consortium consists of three partners: 34% held by Carlos Alberto Solarte Solarte and 33% each held by Conconcreto and CSS Constructores.

Buenaventuyra, with a population of around 335,000, is Colombia’s main Pacific coast port. The highway forms part of the Bogotá-Buenaventura corridor, which transports more than 40% of the country's cargo to be exported by way of the Pacific Ocean.

Meanwhile, president of Colombia's national development bank Financiera de Desarrollo Nacional, Clemente del Valle, said that the financing of eight projects in the first wave of Colombia’s 4G road strategy should be finalised by August. Del Valle said that 17 financial institutions, including five banks as well local and international monetary funds, are willing to support 4G roads.

The second wave of project is likely to need more funding than the first and he government will put the proceeds from the sale of government stock in the energy firm Isagen towards second wave projects.

However, the director of Colombia’s National Planning Department, Simon Gaviria, warned that more work focus needs to be applied to secure timely private sector funding for 4G projects, according to a report by El Espectador newspaper. He said that $10.03 billion is needed for the first wave, but so far only one project has secured the necessary capital.

Related Content

  • The IRF is releasing its statistics on road data for the period 2006-2007
    March 6, 2012
    IRF releases World Road Statistics (WRS), containing road data covering the period 2002-2007. The WRS 2009 includes high quality road and transport statistics for more than 185 countries, which have been compiled from a wide range of national, international and intergovernmental sources
  • Thirst for Infrastructure: The Belt & Road Initiative
    November 8, 2017
    Susanna Zammataro, IRF Geneva, writes: The China Highway and Transportation Society (CHTS) – an esteemed member of IRF – will be hosting a special Session on the Belt and Road Initiative during the IRF World Meeting in Delhi, 14th-17th November 2017. Last May, president Xi Jinping welcomed 28 heads of state and government to Beijing to celebrate the “Belt and Road” initiative, an ambitious plan in terms of infrastructure development, but also in terms of foreign policy. Launched in 2013 as “One belt, On
  • UK exports and imports of construction equipment are up 21% in Q3 2017
    November 28, 2017
    UK exports of construction and earthmoving equipment remained buoyant for the first nine months 2017, showing a 21% increase compared with the same period 2016. Imports of equipment also remained strong, showing a 12% increase in the same period over 2016. In the third quarter 2017, exports equipment showed a further modest increase for the fourth consecutive quarter. Exports in Q3 were 1.3% up on Q2 levels at €807 million (£723 million). This was the highest quarterly level for more than two years
  • NCC picks up Eysturoy and Sandoy tunnel contracts in the Faroes
    November 15, 2016
    Swedish construction company NCC has signed a contract to build two sub-sea road tunnels in the Faroe Islands, an archipelago north of Scotland. The first project – the Eysturoy Tunnel between Eysturoy and Streymoy - will cost around €152 million. The value of second one – the Sandoy Tunnel between Streymoy and Sandoy – will cost about €120 million, but there is an option for the government-owned client, P/F Eystur- och Sandoyartunlar (EST), not to proceed. The government created the company, Eystur – og