Skip to main content

Consortium Via al Puerto to finish Colombia’s Buga-Buevantura road

Colombia’s National Infrastructure Agency (ANI) has approved Consorcio Estructura Plural Via al Puerto to build the remaining 26.5km of the Buga-Buenaventura dual carriageway. Construction costs will be just under US$358 million with another $645 million likely needed to maintain and operate the public-private partnership road for 30 years. Works include construction of two tunnels, 12 bridges, 7.5km of cycle lanes, as well as maintenance of 111km of the main road, according to a report by El Pais new
May 24, 2016 Read time: 2 mins
Colombia’s National Infrastructure Agency (ANI) has approved Consorcio Estructura Plural Via al Puerto to build the remaining 26.5km of the Buga-Buenaventura dual carriageway.

Construction costs will be just under US$358 million with another $645 million likely needed to maintain and operate the public-private partnership road for 30 years.

Works include construction of two tunnels, 12 bridges, 7.5km of cycle lanes, as well as maintenance of 111km of the main road, according to a report by El Pais newspaper.

The consortium consists of three partners: 34% held by Carlos Alberto Solarte Solarte and 33% each held by Conconcreto and CSS Constructores.

Buenaventuyra, with a population of around 335,000, is Colombia’s main Pacific coast port. The highway forms part of the Bogotá-Buenaventura corridor, which transports more than 40% of the country's cargo to be exported by way of the Pacific Ocean.

Meanwhile, president of Colombia's national development bank Financiera de Desarrollo Nacional, Clemente del Valle, said that the financing of eight projects in the first wave of Colombia’s 4G road strategy should be finalised by August. Del Valle said that 17 financial institutions, including five banks as well local and international monetary funds, are willing to support 4G roads.

The second wave of project is likely to need more funding than the first and he government will put the proceeds from the sale of government stock in the energy firm Isagen towards second wave projects.

However, the director of Colombia’s National Planning Department, Simon Gaviria, warned that more work focus needs to be applied to secure timely private sector funding for 4G projects, according to a report by El Espectador newspaper. He said that $10.03 billion is needed for the first wave, but so far only one project has secured the necessary capital.

Related Content

  • Good 2022 start for Italian machinery sector
    June 6, 2022
    The surge in performance indicates possible sales for the full year of around €418.5 million, according to SaMoTer-Veronafiere.
  • ARTBA warns of shortfall in funding for US highways
    February 14, 2014
    According to the American Road & Transportation Builders Association (ARTBA), fixing the Highway Trust Fund (HTF) without generating any new revenue will be highly challenging. ARTBA president Pete Ruane told a Senate panel that such a move would require the equivalent of the US Congress passing and the president signing a 2013-level Murray-Ryan budget deal every year. And this would be sufficient just to maintain current highway and transit programme investment levels. According to a new Congressional Bud
  • Adani-led consortium wins Chhattisgarh highway project
    April 10, 2018
    A consortium led by Adani Enterprises has won a US$175 million highway contract in Chhattisgarh from the National Highways Authority of India. Work in Chhattisgarh, one of India’s 29 states, will be done under a 15-year Hybrid Annuity Model and take nearly two years. Chhattisgarh is heavily forested with many rivers and dramatic waterfalls, making it one of India’s major supplier of hydro-electricity. The highways project involves four-laning a 53km stretch on the Bilaspur-Pathrapali section of the NH
  • Road upgrades for Colombia’s Boyaca
    March 6, 2019
    A series of road upgrades are planned for Colombia’s Boyaca Department for the 2019-2020 period. One of the projects will be for work to a 20km section of the Transversal de Boyaca Route 60, which connects to the Magdalena Medio. Work will also be carried out on the Crucero-Pajarito stretch of the Transversal del Cusiana Route 62, including several bridge upgrades. Repaving work will be carried out on the Duitama-Presidente stretch of Route 55. Paving work is also planned for tertiary roads. In all 77km of