Skip to main content

Consortium Via al Puerto to finish Colombia’s Buga-Buevantura road

Colombia’s National Infrastructure Agency (ANI) has approved Consorcio Estructura Plural Via al Puerto to build the remaining 26.5km of the Buga-Buenaventura dual carriageway. Construction costs will be just under US$358 million with another $645 million likely needed to maintain and operate the public-private partnership road for 30 years. Works include construction of two tunnels, 12 bridges, 7.5km of cycle lanes, as well as maintenance of 111km of the main road, according to a report by El Pais new
May 24, 2016 Read time: 2 mins
Colombia’s National Infrastructure Agency (ANI) has approved Consorcio Estructura Plural Via al Puerto to build the remaining 26.5km of the Buga-Buenaventura dual carriageway.

Construction costs will be just under US$358 million with another $645 million likely needed to maintain and operate the public-private partnership road for 30 years.

Works include construction of two tunnels, 12 bridges, 7.5km of cycle lanes, as well as maintenance of 111km of the main road, according to a report by El Pais newspaper.

The consortium consists of three partners: 34% held by Carlos Alberto Solarte Solarte and 33% each held by Conconcreto and CSS Constructores.

Buenaventuyra, with a population of around 335,000, is Colombia’s main Pacific coast port. The highway forms part of the Bogotá-Buenaventura corridor, which transports more than 40% of the country's cargo to be exported by way of the Pacific Ocean.

Meanwhile, president of Colombia's national development bank Financiera de Desarrollo Nacional, Clemente del Valle, said that the financing of eight projects in the first wave of Colombia’s 4G road strategy should be finalised by August. Del Valle said that 17 financial institutions, including five banks as well local and international monetary funds, are willing to support 4G roads.

The second wave of project is likely to need more funding than the first and he government will put the proceeds from the sale of government stock in the energy firm Isagen towards second wave projects.

However, the director of Colombia’s National Planning Department, Simon Gaviria, warned that more work focus needs to be applied to secure timely private sector funding for 4G projects, according to a report by El Espectador newspaper. He said that $10.03 billion is needed for the first wave, but so far only one project has secured the necessary capital.

Related Content

  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    May 14, 2018
    The Canadian city’s replacement Champlain Bridge will open on schedule at the end of the year. Montreal, one of Canada’s largest cities, will have a well-earned Christmas present in December when the new Champlain Bridge opens after 42 months of construction. The new bridge, part of a six-lane 6km corridor including roads, is being built alongside the original bridge over the Saint Lawrence River and Seaway canal system. The new bridge, 3.4km long, runs from the île des Soeurs to Brossard, immediately dow
  • Romania eyes PPP for three projects, including the Rasnov-Ploiesti
    June 4, 2018
    The Government of Romania will build three motorway segments through a public-private partnership. The motorway segments in question are the 109km long Ungheni-Iasi-Targu Neamt segment, which will have a bridge built over the river Prut, the 100km long Rasnov-Brasov-Ploiesti motorway section, and the 550km long motorway segment between Alexandria and Lugoj.
  • EU noise levels rising
    July 31, 2012
    The EU funded SILENCE project maps the transport causes and possible solutions for reducing noise, reports Alan Peterson With Europe's ever-increasing population growth, the issue of noise for its 100 million citizens is becoming a pressing problem. Over 25% are exposed to critical transport-related noise, according to research by the EU funded SILENCE project, which reported its findings in Germany in May. The purpose of SILENCE is to develop an integrated methodology and technology for the improved contro
  • 2-4 year-old construction equipment tops buyer ‘wish list’
    May 11, 2012
    A leading used construction equipment auctioneer firm boss believes equipment aged between 2 and 4 years is now topping buyers’ ‘wish lists’, as 1 to 2-year-old used stocks deplete. Jonnie Keys, General Manager of Euro Auctions, said that with the cost of new equipment currently up by around 20% on prices in June 2009, the used market is still strong. “Euro Auctions has repeatedly seen over 30% of all plant sold leaving the UK and Europe for projects in Australia, South Africa, South America, Central Ameri