Skip to main content

Consortium Via al Puerto to finish Colombia’s Buga-Buevantura road

Colombia’s National Infrastructure Agency (ANI) has approved Consorcio Estructura Plural Via al Puerto to build the remaining 26.5km of the Buga-Buenaventura dual carriageway. Construction costs will be just under US$358 million with another $645 million likely needed to maintain and operate the public-private partnership road for 30 years. Works include construction of two tunnels, 12 bridges, 7.5km of cycle lanes, as well as maintenance of 111km of the main road, according to a report by El Pais new
May 24, 2016 Read time: 2 mins
Colombia’s National Infrastructure Agency (ANI) has approved Consorcio Estructura Plural Via al Puerto to build the remaining 26.5km of the Buga-Buenaventura dual carriageway.

Construction costs will be just under US$358 million with another $645 million likely needed to maintain and operate the public-private partnership road for 30 years.

Works include construction of two tunnels, 12 bridges, 7.5km of cycle lanes, as well as maintenance of 111km of the main road, according to a report by El Pais newspaper.

The consortium consists of three partners: 34% held by Carlos Alberto Solarte Solarte and 33% each held by Conconcreto and CSS Constructores.

Buenaventuyra, with a population of around 335,000, is Colombia’s main Pacific coast port. The highway forms part of the Bogotá-Buenaventura corridor, which transports more than 40% of the country's cargo to be exported by way of the Pacific Ocean.

Meanwhile, president of Colombia's national development bank Financiera de Desarrollo Nacional, Clemente del Valle, said that the financing of eight projects in the first wave of Colombia’s 4G road strategy should be finalised by August. Del Valle said that 17 financial institutions, including five banks as well local and international monetary funds, are willing to support 4G roads.

The second wave of project is likely to need more funding than the first and he government will put the proceeds from the sale of government stock in the energy firm Isagen towards second wave projects.

However, the director of Colombia’s National Planning Department, Simon Gaviria, warned that more work focus needs to be applied to secure timely private sector funding for 4G projects, according to a report by El Espectador newspaper. He said that $10.03 billion is needed for the first wave, but so far only one project has secured the necessary capital.

Related Content

  • Evonik’s top marks for Colombian tourist highway solution
    May 15, 2014
    Leading German road marking product manufacturer Evonik Industries has played a key role in improving safety on a popular Colombian tourist highway, as Guy Woodford reports Bearing the name of the memorable peacemaker governor of Antioquia, the Guillermo Gaviria Correa road, located between the Colombian municipalities of Medellin and San Jerónimo, connects Medellin to the Uraba Gulf part of the Caribbean Sea. In operation since 2007, the road, in combination with the Fernando Gómez Martínez tunnel –
  • New bridge is spanning China’s Yangtze River
    June 28, 2013
    There is massive development in design and construction of bridges in China and the Yingwuzhou Bridge over the Yangtze River is one key project – Mike Woof reports, with assistance from Route One’s Chinese publishing partner *CMTM Called the Mother River, the Yangtze is a focal point for China politically, economically and culturally. The river has been at the heart of China’s development for millennia, its history stretching back as far as the dawn of human civilisation. The name Yangtze, or Yangzi, is its
  • Important road works for Slovakia
    July 6, 2023
    Important road connection works are underway for Slovakia.
  • Colombia road project targets may not be met
    October 10, 2017
    The ambitious road development programme set out by the Colombian Government may not meet all of its targets. The National Development Plan of 2014-2018 has set out plans for the completion of key road and highway connections, including several bridge and tunnel links. However, Colombia's National Infrastructure Agency (ANI) has so far attained 50% of the targets set out in its road development programme for the period.