Skip to main content

Colombian highway projects under development

A finance package has been secured in Colombia for the Autopista al Mar 1 highway project. A loan worth close to US$206 million is being provided by the national development bank, Financiera de Desarrollo Nacional (FDN). The highway forms part of Colombia’s 4G infrastructure development plan and the finance package will be provided in three separate tranches. The construction work is being carried out by a consortium comprising Strabag, Concay and Sacyr Concesiones. The project will upgrade the 71km
June 29, 2018 Read time: 2 mins

A finance package has been secured in Colombia for the Autopista al Mar 1 highway project. A loan worth close to US$206 million is being provided by the national development bank, Financiera de Desarrollo Nacional (FDN). The highway forms part of Colombia’s 4G infrastructure development plan and the finance package will be provided in three separate tranches.

The construction work is being carried out by a consortium comprising Strabag, Concay and Sacyr Concesiones. The project will upgrade the 71km existing route connecting Santa Fe in Antioquia and Bolombolo. The work also includes widening the 43km route between Medellin and Santa Fe, in Antioquia Department. Other key portions of the project include the construction of the 4.6km Tunel de Occidente as well as building no less than 39 bridges.

Meanwhile work to build the Toyo Tunnel (Tunel del Toyo) in Antioquia Department is now around 64% complete. The tunnel measures 9.8km long and should be ready for traffic by 2022. The link is being built bya consortium comprising FCC Construction, Cass Builders and Company, Carlos Alberto Solarte and Estyma Studies and Handling. The tunnel route runs underneath the mountains of western Antioquia, an area that is difficult to access at present due to its challenging topography. Construction of the route will improve transport to the port of Uraba, located some 80km to the north of the city of Medellin. Work is also underway on the nearby Tunel 18, a 258m tunnel section located close to Canasgordas, as well as the Puente 13 bridge and a number of access roads

However there are questions surrounding the highway widening project  for the Bogota-Girardot route. A preliminary investigation is being carried out into the construction partnership handling the $586.3 million road widening work along a 154km stretch of the highway connecting the capital Bogota with Girardot. The investigation is being carried out by the official the industry and trade watchdog (SIC), focussing on the tender process.

Related Content

  • Tunisia’s $257 million Bizerte Bridge
    June 23, 2025
    Construction work is underway for Tunisia’s $257 million Bizerte Bridge project.
  • Colombia’s Toyo Tunnel project in hand
    May 31, 2019
    Progress is being made for Colombia’s Toyo Tunnel project. Around 20% of the work has been carried out. Building the tunnel and the first stage of the connecting highway sections in Antioquia includes the construction of 17 bridges, seven tunnel sections and 4.4km of road. Tendering for the second stage of the project is due to start soon and will include building a further 19.4km of highway. The Toyo Tunnel project and the entire highway was originally expected to cost US$603.5 million but is now expected
  • Possible PPP for Mulalo-Loboguerrero
    September 9, 2024
    The current contract is a design-build-finance-operate-maintain for upgrades and new lanes for the 32km-long project in the Valley of the Cauca, Colombia.
  • Colombian road contract
    July 21, 2023
    A key Colombian road contract is in focus.