Skip to main content

Colombian highway projects under development

A finance package has been secured in Colombia for the Autopista al Mar 1 highway project. A loan worth close to US$206 million is being provided by the national development bank, Financiera de Desarrollo Nacional (FDN). The highway forms part of Colombia’s 4G infrastructure development plan and the finance package will be provided in three separate tranches. The construction work is being carried out by a consortium comprising Strabag, Concay and Sacyr Concesiones. The project will upgrade the 71km
June 29, 2018 Read time: 2 mins

A finance package has been secured in Colombia for the Autopista al Mar 1 highway project. A loan worth close to US$206 million is being provided by the national development bank, Financiera de Desarrollo Nacional (FDN). The highway forms part of Colombia’s 4G infrastructure development plan and the finance package will be provided in three separate tranches.

The construction work is being carried out by a consortium comprising Strabag, Concay and Sacyr Concesiones. The project will upgrade the 71km existing route connecting Santa Fe in Antioquia and Bolombolo. The work also includes widening the 43km route between Medellin and Santa Fe, in Antioquia Department. Other key portions of the project include the construction of the 4.6km Tunel de Occidente as well as building no less than 39 bridges.

Meanwhile work to build the Toyo Tunnel (Tunel del Toyo) in Antioquia Department is now around 64% complete. The tunnel measures 9.8km long and should be ready for traffic by 2022. The link is being built bya consortium comprising FCC Construction, Cass Builders and Company, Carlos Alberto Solarte and Estyma Studies and Handling. The tunnel route runs underneath the mountains of western Antioquia, an area that is difficult to access at present due to its challenging topography. Construction of the route will improve transport to the port of Uraba, located some 80km to the north of the city of Medellin. Work is also underway on the nearby Tunel 18, a 258m tunnel section located close to Canasgordas, as well as the Puente 13 bridge and a number of access roads

However there are questions surrounding the highway widening project  for the Bogota-Girardot route. A preliminary investigation is being carried out into the construction partnership handling the $586.3 million road widening work along a 154km stretch of the highway connecting the capital Bogota with Girardot. The investigation is being carried out by the official the industry and trade watchdog (SIC), focussing on the tender process.

Related Content

  • Costa Rican highway under scrutiny
    May 3, 2012
    Investigations are in hand in Costa Rica over a series of faults on the highway linking capital San Jose with Caldera. The US$230 million highway has suffered surface cracking in certain stretches, while a number of landslides have also occurred along the route that have required clearing and for repairs to be made. Costa Rica's authorities are investigating Autopistas del Sol following allegations of corruption with regard to the San Jose to Caldera highway project. The investigations are looking at the co
  • $250 million for Oregon-Washington bridge replacement
    July 10, 2025
    Oregon and Washington will provide $250 million for the Hood River-White Salmon Bridge replacement.
  • BAUER involved in constructing a tunnel under the Suez Canal
    October 4, 2016
    The widened Suez Canal, located at Ismailia in Egypt, is now providing extra capacity for vessels, having been officially opened in August 2015. The waterway has great significance for world trade and has been widened at certain points and also expanded.
  • Stonehenge tunnel preferred bidder announced
    May 27, 2022
    The preferred bidder has been announced for the UK’s Stonehenge tunnel.