Skip to main content

Colombia: Bogota-Tunja road project completed

Work on the dual carriageway project between the cities of Bogota and Tunja in the Boyaca region is finished, said Colombia's vice president German Vargas Lleras. The 206km project, costing nearly US$367 million, included construction of a 6km dual carriageway.
January 10, 2017 Read time: 1 min
Work on the dual carriageway project between the cities of Bogota and Tunja in the Boyaca region is finished, said Colombia's vice president German Vargas Lleras.

The 206km project, costing nearly US$367 million, included construction of a 6km dual carriageway.

Related Content

  • Colombian tunnel drive nearing completion
    October 14, 2019
    The excavation work for the new La Quiebra road tunnel link in Colombia is close to completion. The drive is being carried out from both ends of the tunnel and should meet by November 2019. The tunnel construction work will then include completing the lining, building the roadway and carrying out fitting out work. The 8.4km tunnel is costing around US$170 million to build and should be complete by December 2020. The tunnel will form part of the Vias del Nus 4G highway connecting the country’s second city, M
  • Chile highway link project for Valdivia
    June 26, 2017
    New dual carriageway connections are to be built in Chile to join the town of Valdivia to the Ruta 5 highway. The work is expected to cost US$250 million in all, with the work being planned by Chile’s Ministry of Public Works (MOP) and construction due to start in 2021.
  • Chile highway link project for Valdivia
    June 26, 2017
    New dual carriageway connections are to be built in Chile to join the town of Valdivia to the Ruta 5 highway. The work is expected to cost US$250 million in all, with the work being planned by Chile’s Ministry of Public Works (MOP) and construction due to start in 2021.
  • Green light for S6 dual carriageway section in Zachodniopomorskie
    December 14, 2016
    Poland’s Zachodniopomorskie province has given the go-ahead to the consortium set up by Dragados and Polaqua to start construction of a section of the S6. A deal was done in October 2015 for work on the 24km section of the dual carriageway between Kielpino and Kolobrzeg. The cost is estimated to be nearly €105 million. Meanwhile, a section of the S19 express road - between Slawinek junction and the northern part of the Lublin city ring road – was opened this month. Budimex built the 10km stretch in so