Skip to main content

Cleveland Bridge reports strong activity

Cleveland Bridge UK is reporting strong activity onsite during the pandemic.
By MJ Woof August 5, 2020 Read time: 2 mins
Cleveland Bridge reports strong performance in the first six months of 2020

Cleveland Bridge UK says that it has achieved an increase in onsite activity during the pandemic. The firm reports significant growth for its onsite activity during the first six months of the year, despite the global pandemic. 

The Darlington-based structural steel specialist has seen a 40% jump in business activity during the first half of the year compared to the last six months of 2019. The company has been able to continue to deliver projects during the lockdown period.

Since January, the company has completed steelworks for some major projects. During the lockdown period Cleveland Bridge successfully installed the last of four bridges as part of the £79 million A13 project, which involved widening the road between Orsett and Stanford-le-Hope. The company also completed its work on the Carrington Bridge project, a new road crossing spanning the River Severn in Worcester.

More recently the company fabricated and installed a major new bridge for the Congleton Link Road project.  The 90m-long two-span bridge was required to carry the road over the River Dane.  Comprising six lines of steel girders, forming three braced pairs, the entire steel structure weighed 514tonnes.  All steel components were fabricated from weathering grade steel, which requires no painting or treatment throughout its life.

The increase comes after Cleveland Bridge UK acted quickly to implement new ways of working as a result of the pandemic, including the lockdown period, to enable the continued fabrication and delivery of completed structures to various sites. 

Related Content

  • Emergent markets key for formwork sector growth
    May 21, 2014
    Central and south-east Europe are hotbeds for new highway infrastructure projects utilising cutting-edge formwork solutions, while a number of leading formwork manufacturers are also looking at emergent markets for growth. Guy Woodford reports Travelling between Hungary’s capital Budapest and Southern Dalmatia now takes less time thanks to the Pan-European Corridor Vc – European route 73. Numerous tunnels and bridges are erected along the 397km stretch of the European route 73 through Bosnia owing to the
  • New NY Bridge - Tappan Zee - main span towers poured
    December 16, 2016
    One of the largest US infrastructure projects is nearer completion after recent topping out of the eight main span towers of the New NY Bridge. The final concrete pour was in mid-December and all piles - more than 1,000 - have been installed in Hudson River. To date, 3,000 roadway panels for the approaches - making 5.5km in length - have been installed, according to the New York State Thruway Authority, owner of the New NY Bridge project. The New NY Bridge, also called the Tappan Zee Bridge, is on tra
  • Lower Thames Crossing gets green light
    March 26, 2025
    The 14.5-mile project near London will include a 2.6-mile tunnel under the Thames River and come at a cost of around £8.3 billion.
  • Liebherr retains positive business outlook
    November 6, 2020
    Liebherr retains a positive business outlook, despite the pandemic.