Skip to main content

Cleveland Bridge reports strong activity

Cleveland Bridge UK is reporting strong activity onsite during the pandemic.
By MJ Woof August 5, 2020 Read time: 2 mins
Cleveland Bridge reports strong performance in the first six months of 2020

Cleveland Bridge UK says that it has achieved an increase in onsite activity during the pandemic. The firm reports significant growth for its onsite activity during the first six months of the year, despite the global pandemic. 

The Darlington-based structural steel specialist has seen a 40% jump in business activity during the first half of the year compared to the last six months of 2019. The company has been able to continue to deliver projects during the lockdown period.

Since January, the company has completed steelworks for some major projects. During the lockdown period Cleveland Bridge successfully installed the last of four bridges as part of the £79 million A13 project, which involved widening the road between Orsett and Stanford-le-Hope. The company also completed its work on the Carrington Bridge project, a new road crossing spanning the River Severn in Worcester.

More recently the company fabricated and installed a major new bridge for the Congleton Link Road project.  The 90m-long two-span bridge was required to carry the road over the River Dane.  Comprising six lines of steel girders, forming three braced pairs, the entire steel structure weighed 514tonnes.  All steel components were fabricated from weathering grade steel, which requires no painting or treatment throughout its life.

The increase comes after Cleveland Bridge UK acted quickly to implement new ways of working as a result of the pandemic, including the lockdown period, to enable the continued fabrication and delivery of completed structures to various sites. 

Related Content

  • Gordie Howe Bridge towers rise
    January 19, 2022
    Each tower is composed of 51 segments constructed using a jump-form climbing system.
  • Sunderland’s New Wear Crossing takes shape
    February 16, 2017
    The New Wear Crossing will be the first bridge to be built over the River Wear in Sunderland, UK, for more than 40 years Raising the bridge’s 100m-tall pylon promised to be a stunning visual sight, but also a tricky operation dictated by extremely variable local weather. World Highways went to press just before the operation, but not before the pylon had arrived by barge on January 7. It had completed a two-day crossing of the often unpredictable North Sea from the Belgian port of Ghent where it was f
  • Volvo CE reports improving financial position
    October 19, 2020
    Volvo CE is reporting an improving financial position.
  • Forming iconic structures
    July 18, 2012
    Specially designed and constructed formwork is being used to create some iconic bridges worldwide The Golden Ears Bridge over the Fraser River will unite the municipalities of Richmond, New Westminister and Delta in the scenic British Columbia province of Canada. The bridge, part of a CAD$800 million (US$670 million) project, is an 'extra dosed' cable stayed bridge, which means the deck will be supported by both cables and the structure itself. This design reduces the overall height of the two towers as req