Skip to main content

Cleveland Bridge reports strong activity

Cleveland Bridge UK is reporting strong activity onsite during the pandemic.
By MJ Woof August 5, 2020 Read time: 2 mins
Cleveland Bridge reports strong performance in the first six months of 2020

Cleveland Bridge UK says that it has achieved an increase in onsite activity during the pandemic. The firm reports significant growth for its onsite activity during the first six months of the year, despite the global pandemic. 

The Darlington-based structural steel specialist has seen a 40% jump in business activity during the first half of the year compared to the last six months of 2019. The company has been able to continue to deliver projects during the lockdown period.

Since January, the company has completed steelworks for some major projects. During the lockdown period Cleveland Bridge successfully installed the last of four bridges as part of the £79 million A13 project, which involved widening the road between Orsett and Stanford-le-Hope. The company also completed its work on the Carrington Bridge project, a new road crossing spanning the River Severn in Worcester.

More recently the company fabricated and installed a major new bridge for the Congleton Link Road project.  The 90m-long two-span bridge was required to carry the road over the River Dane.  Comprising six lines of steel girders, forming three braced pairs, the entire steel structure weighed 514tonnes.  All steel components were fabricated from weathering grade steel, which requires no painting or treatment throughout its life.

The increase comes after Cleveland Bridge UK acted quickly to implement new ways of working as a result of the pandemic, including the lockdown period, to enable the continued fabrication and delivery of completed structures to various sites. 

Related Content

  • XCMG reports record results
    May 14, 2024
    XCMG is reporting record financial results.
  • Well structured maintenance
    January 4, 2013
    Major bridge maintenance and replacement projects across the world are extending the life of many impressive historic landmarks as Guy Woodford reports The Tamar Bridge, part of the main A38 trunk road linking Saltash in Cornwall with Plymouth in Devon, south west England, marked its 50th anniversary with a steel deck resurfacing project involving Stirling Lloyd's Eliminator bridge deck waterproofing system. Jointly owned by Plymouth City Council and Cornwall Council, the Tamar has a suspended length of 642
  • Liebherr bullish with strong results
    April 5, 2022
    Liebherr is bullish with strong financial results.
  • Bridge drainage solution prevents water damage
    February 10, 2012
    Pipeline & Drainage Systems (PDS), is pointing to its EnviroDeck drainage product saying that unless properly drained, water can cause severe damage to bridges, particularly on deck surfaces where it may become trapped.