Skip to main content

Cleveland Bridge reports healthy results

Cleveland Bridge UK reports healthy results for the fourth consecutive year. The firm’s strong profits are said to add further strength to its balance sheet and it is continuing to develop its order book with new projects. Despite uncertainty in the UK construction sector due to Brexit, the Darlington-based company achieved a turnover of £37 million for its financial year ending 31st December 2018, with an operating profit of £1.2 million and an improving balance sheet. Cleveland Bridge continued to grow
September 30, 2019 Read time: 2 mins
Cleveland Bridge reports a contined strong performance for its latest financial period

Cleveland Bridge UK reports healthy results for the fourth consecutive year. The firm’s strong profits are said to add further strength to its balance sheet and it is continuing to develop its order book with new projects.

Despite uncertainty in the UK construction sector due to Brexit, the Darlington-based company achieved a turnover of £37 million for its financial year ending 31st December 2018, with an operating profit of £1.2 million and an improving balance sheet.

Cleveland Bridge continued to grow its order book in this period and the firm says it started 2019 with a strong order position. The company also expects to make further investments to improve on its operational costs in 2020. Throughout the year the company has strengthened its relationship with its sister companies based in the Middle East, increasing its global reach.

In addition to its well-established infrastructure business, Cleveland Bridge has also returned to the Building Structures and Bridge Services markets, sectors in which the company has previous extensive experience and skills.  A large project to carry out rehabilitation and maintenance work on the Humber Bridge, originally fabricated by CBUK is on schedule to be completed next month.

Phil Heathcock, CFO of Cleveland Bridge UK, said: “The investments we have made in people, processes and technology has ensured Cleveland Bridge UK has remained profitable in an uncertain market. The Brexit effect has been negative on UK construction order flow, but we have remained agile and competitive, alongside our reputation for consistently delivering projects to satisfied customers, enabling the company to continue to return positive financial results.”

Related Content

  • Zipping up road lanes – with Barrier Systems
    September 10, 2018
    QMB has a Lindsay Road Zipper on duty near Montreal. World Highways deputy editor David Arminas climbed aboard As vice president of Canadian barrier specialist QMB, based in Laval, Quebec, Marc-Andre Seguin is sanguine about the future for moveable barriers. On the one hand, it looks good. The oft-stated advantage of moveable barriers is that the systems are cheaper to install than adding a lane or two to a highway or bridge. Directional changes to lanes can boost volume on a road without disrupting tra
  • INTERMAT organisers see strong growth in construction
    December 12, 2017
    The organisers of the upcoming INTERMAT trade show for construction and infrastructure see strong growth for the sector. The INTERMAT organisers have unveiled the first Construction Industry Observatory report, which was produced in association with French government agency, Business France. The report provides construction-equipment manufacturers with strategic data on 12 countries in the EMEA zone. These nations have been selected for their planned investment levels in infrastructure, which total €1,600
  • Intermat Observatory report: road spending will dominate for 30 years
    April 23, 2018
    Road spending will dominate global infrastructure investment for the next 30 years, says a new report released at Intermat Paris 2018. According to a research project commissioned in partnership with Business France, the exhibition’s Observatory programme has revealed that €925 billion of investment is planned in Europe between now and 2050, and “the sector offering the highest development potential is roads”. Railways and buildings are the second and third biggest growth areas in Europe, the report adds.
  • Temporary bridge replacement in the US
    July 2, 2019
    A temporary bridge structure provided by Acrow Bridge is maintaining traffic flow for a key crossing in Vermont. The bascule bridge is allowing both vehicular and vessel traffic to pass during the reconstruction work to the North Hero-Grand Isle Drawbridge in Vermont. The US$60 million project involves replacing the historic twin leaf bascule bridge on Lake Champlain. This modular steel bascule bridge is allowing transport to continue to and from the Lake Champlain island towns of North Hero and Grand Isl