Skip to main content

Chinese investors eye Brazilian work, including federal highway BR-153

Chinese investors are reported to be negotiating a contract to work on a section of federal highway BR-153 that goes from Anapolis in the Brazilian state of Goias to Palmas,n in Tocantins. The road is part of the Transbrasiliana Highway. The section was originally awarded to Brazilian construction firm Galvao Engenharia in September 2014, but the company never started expansion works.
January 14, 2016 Read time: 2 mins
Chinese investors are reported to be negotiating a contract to work on a section of federal highway BR-153 that goes from Anapolis in the Brazilian state of Goias to Palmas,n in Tocantins. The road is part of the Transbrasiliana Highway.

The section was originally awarded to Brazilian construction firm Galvao Engenharia in September 2014, but the company never started expansion works.

The concession contract stipulates that the concessionaire would have to invest US$670.62 million over the first five years, during which time all expansion work is to be done.

National land transport agency ANTT has set a deadline of 90 days for the situation to be resolved.

Chinese investors are also said to be interested in entering the tender for the Rodovia do Frango highway in Parana and Santa Catarina states.

State-owned China Railway Construction Company (CRCC) has already formed a partnership with Brazilian construction conglomerate Camargo Correa to tender for Ferrovia de Integracao do Centro-Oeste highway, which connects Campinorte in Goias and Lucas do Rio Verde in Mato Grosso. Since this tender has not yet moved forward, CRCC has also shown interest in the Rio-Vitoria highway.

Chinese companies have shown increased interest in Brazilian infrastructure contracts, including those in electricity generation and air transport, since May last year when president Dilma Rousseff met with Chinese prime minister Li Kiqiang.

Meanwhile, delays continue to plague transport infrastructure works in the city of Belo Horizonte, Minas Gerais state. The extension of the metro service, the

Refurbishment of roads and the widening of BR-381 federal road, as well as metro services, did not get much focus in this year’s federal budget, according to media reports. The refurbishment of roads in the region is set to receive only around $124,200 from the federal budget, but this accounts for just 1% of the total estimated cost. Also, there is no set date for widening works on the BR-381 road.

This year the federal government will cover only 30% of the cost of infrastructure projects.

Related Content

  • Consortium competing for concession contract in Brazil
    August 29, 2014
    The tender process for a major highway project in Brazil attracted only one offer. The tender concerns a 66km stretch of the northern metropolitan road in Belo Horizonte, Minas Gerais State. The offer came from the Rota Metropolitana Norte consortium, comprising Odebrecht TransPort with a 60% share and EcoRodovias and Barbosa Mello Participacoes e Investimentos with 20% each. The deal has yet to be confirmed. Once signed, the contract will be valid for 30 years with the possibility that it could be then ext
  • Odebrecht wins Brazilian highway concession
    November 29, 2013
    Odebrecht has been awarded a concession for Brazil’s important BR-163 federal highway route. The 851km section of highway runs through Mato Grosso state and the deal is worth some US$2 billion, according to a report by Business News Americas. As part of its contract, Odebrecht will have to widen a 454km stretch of the route within five years and is also required to build nine new toll booths.
  • Brazil motorway concession package awarded
    October 7, 2019
    A major motorway concession package has been awarded in Brazil to road company EcoRodovias.
  • Brazilian project due
    February 9, 2012
    Work on the eastern section of Sao Paulo's Mario Covas orbital highway is being given the official go-ahead. Approval has been given by Sao Paulo's state environmental agency Consema for the 44.5km extension of the highway.