Skip to main content

Chile’s highway plans crucial for economy

Chile’s highway development programme is crucial to the country’s future economic growth. That is the finding of a study by the OECD. According to the report, a 27% increase in highway development is required around Chile’s around cities and ports by 2030. This is because Chile's economy relies heavily on exports. However, a possible hold-up could come from delays facing key highway projects at present. In particular, delays due to environmental assessments are holding back progress with three transport lin
May 19, 2017 Read time: 2 mins

Chile’s highway development programme is crucial to the country’s future economic growth. That is the finding of a study by the OECD. According to the report, a 27% increase in highway development is required around Chile’s around cities and ports by 2030. This is because Chile's economy relies heavily on exports. However, a possible hold-up could come from delays facing key highway projects at present. In particular, delays due to environmental assessments are holding back progress with three transport link projects. The projects have already been awarded to concessionaires. Work on the US$870 million Americo Vespucio Oriente highway has been delayed for 37 months as the project has yet to receive an environmental permit. Work on the $130 million New Industrial Bridge over the Biobío River has been delayed by 28 months while work on the $120 million El Melon Tunnel has been delayed by 10 months. The Chilean Chamber of Construction (CChC) has voice its criticisms of the environmental assessment process as it does not have any specific time limits. Instead the CChC has called for better coordination between State bodies.

Related Content

  • Chinese contractor wins major Nigerian road project
    November 11, 2013
    A road construction contract worth US$1.07 billion has been awarded to China Railway Construction in Nigeria. The Ministry of Delta Affairs of Nigeria awarded the package of works for Section V of the A121 East-West highway to China Civil Engineering Construction, a division of China Railway Construction. The work is expected to take five years to complete and includes design as well as construction. When it is complete, the A121 will connect Nigeria’s two main North-South highways. Its route runs from the
  • Colombia’s massive highway programme is moving forward
    June 13, 2017
    Colombia is pushing ahead with its 4G road development programme. Progress is being made with the construction of the Girardot-Honda-Puerto Salgar road connection, which is expected to cost US$518.6 million and is around 37% complete.
  • US infrastructure spending
    January 2, 2024
    US$492 billion in infrastructure funding remains to be allocated, but it all ends in 2026 by Mary Scott Nabers
  • Turkey’s new Marmara Highway project
    June 8, 2017
    By the end of 2018, a shiny new strip of asphalt will skirt around Turkey’s largest city, Istanbul, providing a new transport connection.