Skip to main content

Chile’s Chacao Bridge project - futuresecured

Chile’s landmark Chacao Bridge project now looks to be back on a sound footing, with completion expected in late 2022 or early 2023. This projects for the 2.6km-long bridge was to have been built jointly by Brazilian firm OAS and South Korean company Hyundai. However OAS hit financial difficulties and had to withdraw from the project. As a result, Hyundai will now buy the 49% stake OAS had in the project. As Hyundai already has a 51% stake in the bridge project, this will give the firm total ownership ove
July 19, 2018 Read time: 2 mins
Chile’s landmark Chacao Bridge project now looks to be back on a sound footing, with completion expected in late 2022 or early 2023.


This projects for the 2.6km-long bridge was to have been built jointly by Brazilian firm 1511 OAS and South Korean company 236 Hyundai. However OAS hit financial difficulties and had to withdraw from the project. As a result, Hyundai will now buy the 49% stake OAS had in the project. As Hyundai already has a 51% stake in the bridge project, this will give the firm total ownership over the works.

The project has been subject to a number of delays and an earlier plan was cancelled at a fairly late stage over cost concerns. The new bridge will be a suspension type structure designed to cope with the often severe earthquakes in the area. It is also being designed and constructed to cope with high winds (of up to 240km/h) and strong sea currents that also occur in the area.

Building the bridge will provide an important transport link to Chiloe Island, providing a key economic boost to the area in terms of tourism and trade. The new bridge will replace the current ferry traffic on which the islanders rely, cutting travel times to just three minutes compared with the 25-45 minutes that the ferry crossing involves.

For more information on companies in this article

Related Content

  • Turkey’s 1915 Çanakkale Bridge opens
    April 11, 2022
    The bridge beats Japan’s Akashi Kaikyo Bridge to be the world’s longest suspension bridge.
  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci
  • Brisbane's highway of distinction
    August 2, 2012
    A massive AU$2 billion update of the Gateway Motorway in Queensland is underway to improve an infrastructure stretched by population boom. Report and photographs by Adrian Greeman Just 20 years after the Australian city of Brisbane built its Gateway Motorway with a high slim signature bridge dominating the river skyline, the road is being completely revamped. Some 12km of urban route on the south of the Brisbane River is being expanded to take much increased traffic levels; the north is getting a completely
  • New bridge link needed for Cape Cod
    October 9, 2019
    New bridge links are needed for Cape Cod, in the US state of Massachusetts.