Skip to main content

Chile’s Chacao Bridge project - futuresecured

Chile’s landmark Chacao Bridge project now looks to be back on a sound footing, with completion expected in late 2022 or early 2023. This projects for the 2.6km-long bridge was to have been built jointly by Brazilian firm OAS and South Korean company Hyundai. However OAS hit financial difficulties and had to withdraw from the project. As a result, Hyundai will now buy the 49% stake OAS had in the project. As Hyundai already has a 51% stake in the bridge project, this will give the firm total ownership ove
July 19, 2018 Read time: 2 mins
Chile’s landmark Chacao Bridge project now looks to be back on a sound footing, with completion expected in late 2022 or early 2023.


This projects for the 2.6km-long bridge was to have been built jointly by Brazilian firm 1511 OAS and South Korean company 236 Hyundai. However OAS hit financial difficulties and had to withdraw from the project. As a result, Hyundai will now buy the 49% stake OAS had in the project. As Hyundai already has a 51% stake in the bridge project, this will give the firm total ownership over the works.

The project has been subject to a number of delays and an earlier plan was cancelled at a fairly late stage over cost concerns. The new bridge will be a suspension type structure designed to cope with the often severe earthquakes in the area. It is also being designed and constructed to cope with high winds (of up to 240km/h) and strong sea currents that also occur in the area.

Building the bridge will provide an important transport link to Chiloe Island, providing a key economic boost to the area in terms of tourism and trade. The new bridge will replace the current ferry traffic on which the islanders rely, cutting travel times to just three minutes compared with the 25-45 minutes that the ferry crossing involves.

For more information on companies in this article

Related Content

  • New Turkish bridge opens to traffic
    June 30, 2016
    Turkey’s new Osman Gazi Bridge has now opened for traffic. This bridge can carry 40,000 vehicles/day, while halving the travel time needed using previous routes. This is a six lane suspension bridge measuring 3km and spanning the Sea of Marmara. Construction has taken 42 months and the structure has been designed to cope with the risk of earthquakes. The project has been co-ordinated by Japanese construction company IHI, with Siemens handling the role of electro and mechanical contractor. Siemens has dev
  • A bridge of hope?
    July 18, 2012
    As Russia prepares for a major Asia Pacific conference in nearly four years' time, the economic climate is felt in other countries in the region. Patrick Smith reports AUS$1 billion-plus suspension bridge is to be built to link the city of Vladivostok in the far east of Russia and Russky Island. Russia's President Dmitry Medvedev has signed an instruction for construction of the 3,150m long bridge, which is intended to provide access to the 24th Asia Pacific Economic Cooperation (APEC) summit, to be held o
  • Italy’s giant Messina Strait bridge
    October 2, 2024
    Report being published for Italy’s giant Messina Strait bridge
  • Mozambique bridge due to open
    May 11, 2018
    Mozambique’s Maputo-Catembe Bridge is due to open shortly and will become Africa’s longest suspension bridge. The 3km bridge will form part of the road connection between Maputo, Mozambique’s capital, and Catembe. The bridge is costing over US$700 million, with much of the necessary funding being provided by the Export Import Bank of China. The new bridge will improve transport and reduce journey times for drivers, who currently have to rely on ferries travelling between Maputo and Catembe.