Skip to main content

Canadian PM Trudeau warned of costs rises for Gordie Howe Bridge

A devaluing Canadian dollar has pushed up the cost for building a signature Windsor-Detroit bridge by around US$2.5 billion, according to Canadian media reports. The increase more than doubles what was believed needed by the Canadian government to construct the Gordie Howe Bridge, named after a Canadian ice hockey player who played most of his career for the Detroit Red Wings. The toll bridge, to be built under a public private partnership, will link the US city of Detroit, in the state of Michigan, w
January 11, 2016 Read time: 3 mins
A devaluing Canadian dollar has pushed up the cost for building a signature Windsor-Detroit bridge by around US$2.5 billion, according to Canadian media reports.

The increase more than doubles what was believed needed by the Canadian government to construct the Gordie Howe Bridge, named after a Canadian ice hockey player who played most of his career for the Detroit Red Wings.

The toll bridge, to be built under a public private partnership, will link the US city of Detroit, in the state of Michigan, with the Canadian city of Windsor in the province of Ontario.

Although the bridge is economically important to the United State and Canada, it will be a totally Canadian project. Around a quarter of the annual $658 billion Canada-US trade crosses over the river. The vast majority of cross border commercial traffic now uses the 2.3km US privately owned Ambassador Bridge, whose owners have tried to stop the construction of a new bridge.

Canada is also paying an estimated $1.77 million for a US customs plaza on the American side, as well as access roads linking US freeways to the bridge.
 
In January last year the Windsor-Detroit Bridge Authority, set up to manage building a new bridge,  appointed the Canadian arm of California-based 3220 Parsons as general engineering consultant under a reportedly $17 million contract. At the time of the appointment, the value of the Canadian dollar to the US dollar was CAN$1.21. The value now in January is around CAN$1.40.

This month, the news agency Canadian Press reported that Canadian Prime Minister Justin Trudeau was recently warned in secret briefing documents that cost increases were likely. The agency also reported that the Canadian government can expect to collect around $2.84 in tolls over 30 years that would cover the cost increases as calculated by consultants 5299 Deloitte in October.

If all goes well, a new bridge should be open by 2020, although its design is not finalised. Gordie Howe, now 87, is a Canadian ice hockey player who joined the Detroit Red Wings of the National Hockey League in 1946 and over the next 25 years helped the team win four league championships.

The bridge is not without controversy, as %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 22229 0 oLinkExternal reported Reported by World Highways false /sections/key-projects/features/new-international-trade-crossing-linking-canada-and-us/ false false%> by World Highways last year.

A Transport Canada notice in 2008 suggested two designs. A suspension bridge would have an elongated ‘M’ shape, similar to the Ambassador Bridge. A cable-stayed structure would be noticeable by its ‘A’ shape, similar to the Sunshine Skyway Bridge in Tampa, Florida. Both options would be nearly 3km long.

The suspension option would have 855m spans while a cable-stayed bridge would use 840m spans. Both bridges would have the same 40m clearance at the shorelines and have a 47m clearance at channel centre.

Main towers for the cable-stayed option would be 250m high main towers while a suspension bridge’s towers would be around 140m. Both options would have 36m wide decks for six lanes and include a median, shoulders and – security concerns aside - a walkway and/or cycle path on one side.

A Canadian customs plaza might cover around 43 hectares with 29 inbound inspection lanes, including nine for cars, 14 for trucks and five for both cars and trucks. One lane would be for buses.

For more information on companies in this article

Related Content

  • Just stop arguing and build the thing
    December 15, 2017
    The news that the preferred route has been announced for a new road and tunnel link that will bypass the UK’s famous Stonehenge stone circle comes after years of debate. The project is for the construction of a new 13km dual carriageway link and includes a 2.6km stretch of tunnel, which is the subject of some controversy. Because of the archeological importance of the area, the tunnel has been decided as being the best option for the new route. Building a tunnel will allow much of the important archeologi
  • RMD formwork for Qatar’s tallest bridge on Doha East Corridor
    July 6, 2016
    RMD Kwikform will be supplying tens of thousands of tonnes of its formwork and shoring for construction of Qatar’s tallest bridge on the Doha East Corridor project As well as the bridge, the Corridor contract comprises four interchanges at a total cost of US$612.5 million. Ashghal, Qatar's Public Works Authority, awarded the Corridor project to China Harbour Engineering Design and Construction. Built as a five-lane 11km bypass in Doha, the capital of Qatar, the project will also cater for a rail line
  • Parsons' $12.4 million I-65/I-70 South Split Indianapolis project is a top ten hit
    October 1, 2014
    Engineering and consultancy group Parsons has revealed that its $12.4 million I-65/I-70 South Split project in downtown Indianapolis has been named one of America’s Top 10 Transportation Projects by the American Association of State Highway and Transportation Officials (AASHTO), the American Automobile Association (AAA), and the U.S. Chamber of Commerce. The project, which has been designed by Parsons, will now go an online national vote the People’s Choice Awards.
  • Far from formulaic
    January 4, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford. RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on