Skip to main content

Canadian PM Trudeau warned of costs rises for Gordie Howe Bridge

A devaluing Canadian dollar has pushed up the cost for building a signature Windsor-Detroit bridge by around US$2.5 billion, according to Canadian media reports. The increase more than doubles what was believed needed by the Canadian government to construct the Gordie Howe Bridge, named after a Canadian ice hockey player who played most of his career for the Detroit Red Wings. The toll bridge, to be built under a public private partnership, will link the US city of Detroit, in the state of Michigan, w
January 11, 2016 Read time: 3 mins
A devaluing Canadian dollar has pushed up the cost for building a signature Windsor-Detroit bridge by around US$2.5 billion, according to Canadian media reports.

The increase more than doubles what was believed needed by the Canadian government to construct the Gordie Howe Bridge, named after a Canadian ice hockey player who played most of his career for the Detroit Red Wings.

The toll bridge, to be built under a public private partnership, will link the US city of Detroit, in the state of Michigan, with the Canadian city of Windsor in the province of Ontario.

Although the bridge is economically important to the United State and Canada, it will be a totally Canadian project. Around a quarter of the annual $658 billion Canada-US trade crosses over the river. The vast majority of cross border commercial traffic now uses the 2.3km US privately owned Ambassador Bridge, whose owners have tried to stop the construction of a new bridge.

Canada is also paying an estimated $1.77 million for a US customs plaza on the American side, as well as access roads linking US freeways to the bridge.
 
In January last year the Windsor-Detroit Bridge Authority, set up to manage building a new bridge,  appointed the Canadian arm of California-based 3220 Parsons as general engineering consultant under a reportedly $17 million contract. At the time of the appointment, the value of the Canadian dollar to the US dollar was CAN$1.21. The value now in January is around CAN$1.40.

This month, the news agency Canadian Press reported that Canadian Prime Minister Justin Trudeau was recently warned in secret briefing documents that cost increases were likely. The agency also reported that the Canadian government can expect to collect around $2.84 in tolls over 30 years that would cover the cost increases as calculated by consultants 5299 Deloitte in October.

If all goes well, a new bridge should be open by 2020, although its design is not finalised. Gordie Howe, now 87, is a Canadian ice hockey player who joined the Detroit Red Wings of the National Hockey League in 1946 and over the next 25 years helped the team win four league championships.

The bridge is not without controversy, as %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 22229 0 oLinkExternal reported Reported by World Highways false /sections/key-projects/features/new-international-trade-crossing-linking-canada-and-us/ false false%> by World Highways last year.

A Transport Canada notice in 2008 suggested two designs. A suspension bridge would have an elongated ‘M’ shape, similar to the Ambassador Bridge. A cable-stayed structure would be noticeable by its ‘A’ shape, similar to the Sunshine Skyway Bridge in Tampa, Florida. Both options would be nearly 3km long.

The suspension option would have 855m spans while a cable-stayed bridge would use 840m spans. Both bridges would have the same 40m clearance at the shorelines and have a 47m clearance at channel centre.

Main towers for the cable-stayed option would be 250m high main towers while a suspension bridge’s towers would be around 140m. Both options would have 36m wide decks for six lanes and include a median, shoulders and – security concerns aside - a walkway and/or cycle path on one side.

A Canadian customs plaza might cover around 43 hectares with 29 inbound inspection lanes, including nine for cars, 14 for trucks and five for both cars and trucks. One lane would be for buses.

For more information on companies in this article

Related Content

  • Have your say about digitisation in the construction sector
    April 30, 2018
    What is the state of digitisation in the construction sector and - more importantly - where will it be in three to five years or more? Will the players, large and small, in the value chain simply react to new technologies or shape them to benefit the sector by improving efficiencies and products? Importantly, what and how much cooperation will be needed to drive innovation? Have your say about these issues facing businesses, governments and the supply chain. It takes little more than 10 minutes to fill
  • Cables up for Romania’s Brăila Bridge
    June 16, 2021
    The Astaldi and IHI Infrastructure Systems joint venture reports that work will soon start on the road deck for Romania’s Brăila Bridge.
  • Bangladesh: Cost of Padma Bridge project rises
    January 11, 2016
    The cost of building the Padma Bridge in Bangladesh will be nearly three times the US$2.61 billion estimated in 2011. Also on the rise is the cost of flood prevention work in the form of levee construction – called river training in Bangladesh. The addition of 1.3km of work at the Mawa end of the bridge means the total cost is now $1.2 billion, up from $1.1 billion. Apart from $200 from the $1 billion loan from India the project is not using any foreign financing, according to a report in the Daily S
  • Vinci picks up Lafonataine Tunnel work
    August 12, 2020
    The renovated tunnel is expected to have about 40 years of life.