Skip to main content

Canada: work officially starts on Montreal’s Champlain Bridge

Canada’s infrastructure minister, Denis Label, officially broke ground for Montreal’s replacement Champlain Bridge, saying the project will likely cost US$3.42 billion. The 3.4km Champlain Bridge Corridor Project, including spans and highway expansions, is expected to be completed by 2019. SNC-Lavalin, the 50% stakeholder in the winning consortium Signature on the Saint-Lawrence, recently announced it had finalised the deal with new Champlain Bridge owner Infrastructure Canada. Signature on the Saint-
June 25, 2015 Read time: 3 mins
Canada’s infrastructure minister, Denis Label, officially broke ground for Montreal’s replacement Champlain Bridge, saying the project will likely cost US$3.42 billion.

The 3.4km Champlain Bridge Corridor Project, including spans and highway expansions, is expected to be completed by 2019.

SNC-Lavalin, the 50% stakeholder in the winning consortium Signature on the Saint-Lawrence, recently announced it had finalised the deal with new Champlain Bridge owner Infrastructure Canada. Signature on the Saint-Lawrence will design, construct, finance, operate, maintain and rehabilitate. SSL has entered into a date-certain, fixed-priced contract of around $2.15 billion and the concession period runs October 2049.

The partnership of SNC-Lavalin, 2758 Flatiron and 4761 Dragados Canada are responsible for construction of the project. Consortium equity providers include SNC-Lavalin Capital, 917 ACS Infrastructure Canada and 981 HOCHTIEF PPP Solutions North America. The project is designed by T.Y. Lin International, International Bridge Technologies, SNC-Lavalin and MMM.

The existing bridge – a steel cantilever truss structure built in 1957 – spans the St. Lawrence River which flows from the Great Lakes and is the route for ocean-going ships to reach cities including Chicago deep in the interior of northern North America.

The old bridge is also one of the busiest crossings in the country, carrying between 40-60 million cars, trucks and buses a year. As well, over 11 million transit users travel across it annually. In terms of Canada-US trade, more than $16 billion worth of goods and services use the corridor annually.

The new Champlain Bridge is expected to feature a three-corridor design, including two three-lane corridors for vehicles and a two-lane public transport corridor capable of accommodating a light rail transit system. It will also have a multi-use path for pedestrians and cyclists.

Canada-based Canam-Bridge recently announced it had won the contract to fabricate the superstructure for the new bridge, for which the company expects to use around at least 45,000tonnes of steel.

In a separate statement, ACS said it had secured financing for its work, according to Spanish media. Private finance for the project includes a long-term bond issue in two series subscribed to by HSBC Securities and National Bank Financial.

The short-term finance during the construction period will include bank debt of $1.16 billion, through a syndicate of National Bank of Canada, Bank of Tokyo-3055 Mitsubishi UFJ, Bank of Nova Scotia, Caisse Centrale Desjardins du Quebec, 2714 Sumitomo Mitsui, HSBC Bank Canada, Toronto-Dominion Bank and Bank of China.

There will also be capital contributed by shareholders of the consortium. The public finance portion of the funding will come through three payments associated with the achievement of targets in the project.

For more information on companies in this article

Related Content

  • Canada: National Bank and Axium refinance Sea-to-Sky Highway
    July 19, 2016
    National Bank Financial and Axium Infrastructure have refinanced the Sea-to-Sky Highway Improvement Project in the Canadian province of British Columbia. A statement from Axium said that the US$427 million 25-year public-private-partnership had “strong investor support and an A2 rating from Moody’s”. The Sea-to-Sky Highway Investment Limited Partnership - Axium Infrastructure, Régime de Rentes du Mouvement Desjardins and Nova Scotia Pension Agency - is the consortium in charge of the concession. In
  • Fluor and ACS Infrastructure Canada win Gordie Howe Bridge deal
    July 6, 2018
    A partnership including Fluor and ACS Infrastructure has been chosen to design, build, finance, operate and maintain the Gordie Howe International Bridge project. The client, Windsor-Detroit Bridge Authority (WDBA), announced the appointment of Bridging North America group in the Canadian city of Windsor, across the Detroit River from Detroit in the US state of Michigan. The Gordie Howe International Bridge will connect the two cities by linking Interstate 75 and Interstate 96 in Michigan with the new
  • Stantec: coming to an infrastructure site near you
    April 13, 2017
    Acquisitive Canadian firm Stantec is snapping up more transportation expertise as it moves out of its home North American market. David Arminas reports. Last December, politicians from the US states of Kentucky and Indiana celebrated the opening of the second of two major bridges. A ribbon-cutting ceremony took place in cold wintry weather on the new 762m-long cable-stayed Lewis and Clark Bridge. The event marked the finish of the prestigious three-and-half-year Ohio River Bridges Project.
  • Virginia Interstate highway upgrade project
    February 26, 2019
    A 15km stretch of Interstate 64 in the US state of Virginia will be upgraded, allowing it to handle more traffic.