Skip to main content

Canada: work officially starts on Montreal’s Champlain Bridge

Canada’s infrastructure minister, Denis Label, officially broke ground for Montreal’s replacement Champlain Bridge, saying the project will likely cost US$3.42 billion. The 3.4km Champlain Bridge Corridor Project, including spans and highway expansions, is expected to be completed by 2019. SNC-Lavalin, the 50% stakeholder in the winning consortium Signature on the Saint-Lawrence, recently announced it had finalised the deal with new Champlain Bridge owner Infrastructure Canada. Signature on the Saint-
June 25, 2015 Read time: 3 mins
Canada’s infrastructure minister, Denis Label, officially broke ground for Montreal’s replacement Champlain Bridge, saying the project will likely cost US$3.42 billion.

The 3.4km Champlain Bridge Corridor Project, including spans and highway expansions, is expected to be completed by 2019.

SNC-Lavalin, the 50% stakeholder in the winning consortium Signature on the Saint-Lawrence, recently announced it had finalised the deal with new Champlain Bridge owner Infrastructure Canada. Signature on the Saint-Lawrence will design, construct, finance, operate, maintain and rehabilitate. SSL has entered into a date-certain, fixed-priced contract of around $2.15 billion and the concession period runs October 2049.

The partnership of SNC-Lavalin, 2758 Flatiron and 4761 Dragados Canada are responsible for construction of the project. Consortium equity providers include SNC-Lavalin Capital, 917 ACS Infrastructure Canada and 981 HOCHTIEF PPP Solutions North America. The project is designed by T.Y. Lin International, International Bridge Technologies, SNC-Lavalin and MMM.

The existing bridge – a steel cantilever truss structure built in 1957 – spans the St. Lawrence River which flows from the Great Lakes and is the route for ocean-going ships to reach cities including Chicago deep in the interior of northern North America.

The old bridge is also one of the busiest crossings in the country, carrying between 40-60 million cars, trucks and buses a year. As well, over 11 million transit users travel across it annually. In terms of Canada-US trade, more than $16 billion worth of goods and services use the corridor annually.

The new Champlain Bridge is expected to feature a three-corridor design, including two three-lane corridors for vehicles and a two-lane public transport corridor capable of accommodating a light rail transit system. It will also have a multi-use path for pedestrians and cyclists.

Canada-based Canam-Bridge recently announced it had won the contract to fabricate the superstructure for the new bridge, for which the company expects to use around at least 45,000tonnes of steel.

In a separate statement, ACS said it had secured financing for its work, according to Spanish media. Private finance for the project includes a long-term bond issue in two series subscribed to by HSBC Securities and National Bank Financial.

The short-term finance during the construction period will include bank debt of $1.16 billion, through a syndicate of National Bank of Canada, Bank of Tokyo-3055 Mitsubishi UFJ, Bank of Nova Scotia, Caisse Centrale Desjardins du Quebec, 2714 Sumitomo Mitsui, HSBC Bank Canada, Toronto-Dominion Bank and Bank of China.

There will also be capital contributed by shareholders of the consortium. The public finance portion of the funding will come through three payments associated with the achievement of targets in the project.

For more information on companies in this article

Related Content

  • Fraser Crossing Partners chosen for new Pattullo Bridge in Canada
    February 25, 2020
    Fraser Crossing Partners consists of Acciona Infrastructure Canada and Aecon Constructors.
  • Flatiron wins Winnipeg interchange project in Canada
    August 5, 2015
    US-based contractor Flatiron has won a US$157 million design and build contract for an interchange in the Canadian city of Winnipeg, in the province of Manitoba. The project, for owner Manitoba Infrastructure and Transportation, will replace the existing loop-ramp interchange for Provincial Trunk Highways 59 and 101. Work includes seven precast girder bridges between 40m and 100 meters in length, one cast-in-place box culvert through-pass, construction of 1.5 million cubic meters of interchange embank
  • Vinci picks up Lafonataine Tunnel work
    August 12, 2020
    The renovated tunnel is expected to have about 40 years of life.
  • International firms compete in US bridge project tenders
    May 2, 2012
    The Spanish construction firm ACS is tendering for the construction and operation of four bridges in the US. The firm is tendering in partnership with some other US and international firms for some of the projects, which are worth a total of US$11.4 billion. The Tappan Zee project is expected to cost $5 billion and the deal will be for a design and construction contract. The bridge will be located in New York, is being developed by New York State Thruway Authority and will require two, four-carriageway brid