Skip to main content

Canada: work officially starts on Montreal’s Champlain Bridge

Canada’s infrastructure minister, Denis Label, officially broke ground for Montreal’s replacement Champlain Bridge, saying the project will likely cost US$3.42 billion. The 3.4km Champlain Bridge Corridor Project, including spans and highway expansions, is expected to be completed by 2019. SNC-Lavalin, the 50% stakeholder in the winning consortium Signature on the Saint-Lawrence, recently announced it had finalised the deal with new Champlain Bridge owner Infrastructure Canada. Signature on the Saint-
June 25, 2015 Read time: 3 mins
Canada’s infrastructure minister, Denis Label, officially broke ground for Montreal’s replacement Champlain Bridge, saying the project will likely cost US$3.42 billion.

The 3.4km Champlain Bridge Corridor Project, including spans and highway expansions, is expected to be completed by 2019.

SNC-Lavalin, the 50% stakeholder in the winning consortium Signature on the Saint-Lawrence, recently announced it had finalised the deal with new Champlain Bridge owner Infrastructure Canada. Signature on the Saint-Lawrence will design, construct, finance, operate, maintain and rehabilitate. SSL has entered into a date-certain, fixed-priced contract of around $2.15 billion and the concession period runs October 2049.

The partnership of SNC-Lavalin, 2758 Flatiron and 4761 Dragados Canada are responsible for construction of the project. Consortium equity providers include SNC-Lavalin Capital, 917 ACS Infrastructure Canada and 981 HOCHTIEF PPP Solutions North America. The project is designed by T.Y. Lin International, International Bridge Technologies, SNC-Lavalin and MMM.

The existing bridge – a steel cantilever truss structure built in 1957 – spans the St. Lawrence River which flows from the Great Lakes and is the route for ocean-going ships to reach cities including Chicago deep in the interior of northern North America.

The old bridge is also one of the busiest crossings in the country, carrying between 40-60 million cars, trucks and buses a year. As well, over 11 million transit users travel across it annually. In terms of Canada-US trade, more than $16 billion worth of goods and services use the corridor annually.

The new Champlain Bridge is expected to feature a three-corridor design, including two three-lane corridors for vehicles and a two-lane public transport corridor capable of accommodating a light rail transit system. It will also have a multi-use path for pedestrians and cyclists.

Canada-based Canam-Bridge recently announced it had won the contract to fabricate the superstructure for the new bridge, for which the company expects to use around at least 45,000tonnes of steel.

In a separate statement, ACS said it had secured financing for its work, according to Spanish media. Private finance for the project includes a long-term bond issue in two series subscribed to by HSBC Securities and National Bank Financial.

The short-term finance during the construction period will include bank debt of $1.16 billion, through a syndicate of National Bank of Canada, Bank of Tokyo-3055 Mitsubishi UFJ, Bank of Nova Scotia, Caisse Centrale Desjardins du Quebec, 2714 Sumitomo Mitsui, HSBC Bank Canada, Toronto-Dominion Bank and Bank of China.

There will also be capital contributed by shareholders of the consortium. The public finance portion of the funding will come through three payments associated with the achievement of targets in the project.

For more information on companies in this article

Related Content

  • Kenya rehabilitates, widens, tolls Northern Corridor
    November 8, 2017
    A massive highway project in Kenya will boost transport for the country as well as its neighbours - Shem Oirere reports. Kenya has commenced the process of rehabilitating, expanding and tolling of 657km of East Africa’s Northern Corridor that is anchored on the Indian Ocean port of Mombasa and which links the gateway with landlocked countries of Uganda, Rwanda, Burundi and parts of eastern Democratic Republic of Congo (DRC).
  • Consortium Via al Puerto to finish Colombia’s Buga-Buevantura road
    May 24, 2016
    Colombia’s National Infrastructure Agency (ANI) has approved Consorcio Estructura Plural Via al Puerto to build the remaining 26.5km of the Buga-Buenaventura dual carriageway. Construction costs will be just under US$358 million with another $645 million likely needed to maintain and operate the public-private partnership road for 30 years. Works include construction of two tunnels, 12 bridges, 7.5km of cycle lanes, as well as maintenance of 111km of the main road, according to a report by El Pais new
  • Expectations for growth of UAE infrastucture
    February 9, 2012
    The INTERMAT Middle East event is being launched at a pivotal time of major infrastructure development in the region. As with most sectors, the highways industry has not had a fantastic 18 months in the Gulf. Not only has the recession impacted the delivery of projects across the board, GCC Governments' attention have been switching increasingly to rail, as plans to roll out a Gulf-wide rail system gather steam. GCC countries will invest over US$119.6 billion in infrastructure projects over the next decade
  • Ferrovial, Acciona among Bentley winners
    November 22, 2022
    Finalists presented their projects at Bentley’s recent Going Digital Awards event in London.